Project Control Manager Job Trends in Central London

Project Control Manager
London > Central London

The median Project Control Manager salary in Central London is £60,000 per year, according to job vacancies posted during the 6 months leading to 24 May 2026.

The table below compares current salary benchmarking and summary statistics with the previous two years.

6 months to
24 May 2026
Same period 2025 Same period 2024
Rank 159 - -
Rank change year-on-year - - -
Permanent jobs requiring a Project Control Manager 9 0 0
As % of all permanent jobs in Central London 0.20% - -
As % of the Job Titles category 0.21% - -
Number of salaries quoted 9 0 0
Median annual salary (50th Percentile) £60,000 - -
London median annual salary £60,000 - -

All Permanent IT Job Roles
Central London

For comparison with the information above, the following table provides summary statistics for all permanent IT job vacancies in Central London. Most job vacancies include a discernible job title that can be normalized. As such, the figures in the second row provide an indication of the number of permanent jobs in our overall sample.

Permanent vacancies in Central London with a recognized job title 4,191 2,116 3,430
% of permanent jobs with a recognized job title 95.38% 91.40% 95.30%
Number of salaries quoted 3,051 1,522 2,782
10th Percentile £45,000 £41,250 £40,000
25th Percentile £60,000 £52,500 £52,500
Median annual salary (50th Percentile) £80,000 £72,500 £72,500
Median % change year-on-year +10.34% - -0.97%
75th Percentile £100,000 £96,250 £95,000
90th Percentile - £120,000 £112,500
London median annual salary £75,000 £75,000 £70,000
% change year-on-year - +7.14% -3.45%

Project Control Manager
Job Vacancy Trend in Central London

Historical trend showing the proportion of permanent IT job postings featuring 'Project Control Manager' in the job title relative to all permanent IT jobs advertised in Central London.

Project Control Manager job vacancy trend in Central London

Project Control Manager
Salary Trend in Central London

Salary distribution trend for Project Control Manager job vacancies in Central London.

Salary distribution trend for Project Control Manager job vacancies in Central London

Project Control Manager
Job Locations in Central London

The table below looks at the demand and provides a guide to the median salaries quoted in IT jobs citing Project Control Manager within the Central London region over the 6 months to 24 May 2026. The 'Rank Change' column provides an indication of the change in demand within each location based on the same 6 month period last year.

Location Rank Change
on Same Period
Last Year
Matching
Permanent
IT Job Ads
Median Salary
Past 6 Months
Median Salary
% Change
on Same Period
Last Year
Live
Jobs
City of London - 9 £60,000 -
Project Control Manager
London