The median Project Control Manager salary in London is £60,000 per year, according to job vacancies posted during the 6 months leading to 24 May 2026.
The table below compares current salary benchmarking and summary statistics with the previous two years.
|
|
6 months to 24 May 2026 |
Same period 2025 | Same period 2024 |
|---|---|---|---|
| Rank | 406 | - | - |
| Rank change year-on-year | - | - | - |
| Permanent jobs requiring a Project Control Manager | 9 | 0 | 0 |
| As % of all permanent jobs in London | 0.043% | - | - |
| As % of the Job Titles category | 0.047% | - | - |
| Number of salaries quoted | 9 | 0 | 0 |
| Median annual salary (50th Percentile) | £60,000 | - | - |
| England median annual salary | £60,000 | - | £47,000 |
All Permanent IT Job Roles
London
For comparison with the information above, the following table provides summary statistics for all permanent IT job vacancies in London. Most job vacancies include a discernible job title that can be normalized. As such, the figures in the second row provide an indication of the number of permanent jobs in our overall sample.
| Permanent vacancies in London with a recognized job title | 19,284 | 10,802 | 22,146 |
| % of permanent jobs with a recognized job title | 92.24% | 89.94% | 94.33% |
| Number of salaries quoted | 13,200 | 6,882 | 16,673 |
| 10th Percentile | £40,000 | £41,250 | £37,500 |
| 25th Percentile | £55,000 | £55,000 | £51,250 |
| Median annual salary (50th Percentile) | £75,000 | £75,000 | £70,000 |
| Median % change year-on-year | - | +7.14% | -3.45% |
| 75th Percentile | £95,000 | £100,000 | £93,750 |
| 90th Percentile | £100,000 | £122,500 | £115,000 |
| England median annual salary | £55,250 | £57,500 | £53,000 |
| % change year-on-year | -3.91% | +8.49% | -12.83% |
Project Control Manager
Job Vacancy Trend in London
Historical trend showing the proportion of permanent IT job postings featuring 'Project Control Manager' in the job title relative to all permanent IT jobs advertised in London.
Project Control Manager
Salary Trend in London
Salary distribution trend for Project Control Manager job vacancies in London.
Project Control Manager
Job Locations in London
The table below looks at the demand and provides a guide to the median salaries quoted in IT jobs citing Project Control Manager within the London region over the 6 months to 24 May 2026. The 'Rank Change' column provides an indication of the change in demand within each location based on the same 6 month period last year.
| Location | Rank Change on Same Period Last Year |
Matching Permanent IT Job Ads |
Median Salary Past 6 Months |
Median Salary % Change on Same Period Last Year |
Live Jobs |
|---|---|---|---|---|---|
| Central London | - | 9 | £60,000 | - | |