The table below provides summary statistics and contractor rates for jobs advertised in Hampshire requiring Critical Path Analysis skills. It covers contract job vacancies from the 6 months leading up to 16 March 2026, with comparisons to the same periods in the previous two years.
| 6 months to 16 Mar 2026 |
Same period 2025 | Same period 2024 | |
|---|---|---|---|
| Rank | 96 | 70 | - |
| Rank change year-on-year | -26 | - | - |
| Contract jobs citing Critical Path Analysis | 1 | 2 | 0 |
| As % of all contract jobs in Hampshire | 0.065% | 0.27% | - |
| As % of the Processes & Methodologies category | 0.080% | 0.31% | - |
| Number of daily rates quoted | 1 | 2 | 0 |
| 10th Percentile | - | £370 | - |
| 25th Percentile | £456 | £370 | - |
| Median daily rate (50th Percentile) | £463 | £371 | - |
| Median % change year-on-year | +24.71% | - | - |
| 75th Percentile | £469 | £371 | - |
| 90th Percentile | - | £372 | - |
| South East median daily rate | £525 | £372 | £491 |
| % change year-on-year | +41.23% | -24.25% | +10.59% |
All Process & Methodology Skills
Hampshire
Critical Path Analysis falls under the Processes and Methodologies category. For comparison with the information above, the following table provides summary statistics for all contract job vacancies requiring process or methodology skills in Hampshire.
| Contract vacancies with a requirement for process or methodology skills | 1,256 | 651 | 1,333 |
| As % of all contract IT jobs advertised in Hampshire | 81.56% | 89.42% | 86.06% |
| Number of daily rates quoted | 815 | 474 | 727 |
| 10th Percentile | £325 | £327 | £370 |
| 25th Percentile | £458 | £457 | £459 |
| Median daily rate (50th Percentile) | £535 | £550 | £575 |
| Median % change year-on-year | -2.73% | -4.35% | +9.52% |
| 75th Percentile | £650 | £625 | £675 |
| 90th Percentile | £739 | £675 | £738 |
| South East median daily rate | £500 | £510 | £500 |
| % change year-on-year | -1.96% | +2.00% | -0.20% |
| Number of hourly rates quoted | 100 | 39 | 122 |
| 10th Percentile | £12.60 | £20.09 | £12.29 |
| 25th Percentile | £16.17 | £30.63 | £17.85 |
| Median hourly rate | £20.71 | £57.75 | £47.50 |
| Median % change year-on-year | -64.14% | +21.58% | -1.04% |
| 75th Percentile | £40.00 | £73.13 | £62.50 |
| 90th Percentile | £55.00 | £75.00 | £75.16 |
| South East median hourly rate | £30.00 | £35.00 | £37.00 |
| % change year-on-year | -14.29% | -5.41% | -17.78% |
Critical Path Analysis
Job Vacancy Trend in Hampshire
Historical trend showing the proportion of contract IT job postings citing Critical Path Analysis relative to all contract IT jobs advertised in Hampshire.
Critical Path Analysis
Daily Rate Trend in Hampshire
Contractor daily rate distribution trend for jobs in Hampshire citing Critical Path Analysis.
Critical Path Analysis
Hourly Rate Trend in Hampshire
Contractor hourly rate distribution trend for jobs in Hampshire citing Critical Path Analysis.
Critical Path Analysis
Contract Job Locations in Hampshire
The table below looks at the demand and provides a guide to the median contractor rates quoted in IT jobs citing Critical Path Analysis within the Hampshire region over the 6 months to 16 March 2026. The 'Rank Change' column provides an indication of the change in demand within each location based on the same 6 month period last year.
| Location | Rank Change on Same Period Last Year |
Matching Contract IT Job Ads |
Median Daily Rate Past 6 Months |
Median Daily Rate % Change on Same Period Last Year |
Live Jobs |
|---|---|---|---|---|---|
| Havant | - | 1 | £463 | - | 1 |
| Critical Path Analysis South East |
|||||
Critical Path Analysis
Co-Occurring Skills & Capabilities in Hampshire by Category
The following tables expand on the one above by listing co-occurrences grouped by category. They cover the same employment type, locality and period, with up to 20 co-occurrences shown in each category:
|
|
|||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||