Project Controller Job Trends in the South West

Project Controller
England > South West

As of 15 January 2026, there is not enough information available from job vacancies posted within the last 6 months to determine the median Project Controller salary in the South West.

6 months to
15 Jan 2026
Same period 2025 Same period 2024
Rank 173 - 215
Rank change year-on-year - - +54
Permanent jobs requiring a Project Controller 9 0 2
As % of all permanent jobs in the South West 0.18% - 0.042%
As % of the Job Titles category 0.19% - 0.044%
Number of salaries quoted 0 0 2
10th Percentile - - £35,850
25th Percentile - - £37,500
Median annual salary (50th Percentile) - - £44,000
Median % change year-on-year - - +41.94%
75th Percentile - - £52,500
90th Percentile - - £55,350
England median annual salary £30,000 £42,000 £50,000
% change year-on-year -28.57% -16.00% +61.29%

All Permanent IT Job Roles
South West

For comparison with the information above, the following table provides summary statistics for all permanent IT job vacancies in the South West. Most job vacancies include a discernible job title that can be normalized. As such, the figures in the second row provide an indication of the number of permanent jobs in our overall sample.

Permanent vacancies in the South West with a recognized job title 4,765 3,889 4,523
% of permanent jobs with a recognized job title 93.45% 93.62% 95.83%
Number of salaries quoted 3,306 2,090 3,488
10th Percentile £28,000 £30,000 £29,500
25th Percentile £35,000 £40,000 £39,748
Median annual salary (50th Percentile) £50,000 £52,000 £50,886
Median % change year-on-year -3.85% +2.19% +1.77%
75th Percentile £65,000 £67,500 £66,778
90th Percentile £80,000 £80,000 £80,000
England median annual salary £55,000 £60,000 £57,500
% change year-on-year -8.33% +4.35% -6.50%

Project Controller
Job Vacancy Trend in the South West

Historical trend showing the proportion of permanent IT job postings featuring 'Project Controller' in the job title relative to all permanent IT jobs advertised in the South West.

Project Controller job vacancy trend in the South West

Project Controller
Salary Trend in the South West

Salary distribution trend for Project Controller job vacancies in the South West.

Salary distribution trend for Project Controller job vacancies in the South West

Project Controller
Job Locations in the South West

The table below looks at the demand and provides a guide to the median salaries quoted in IT jobs citing Project Controller within the South West region over the 6 months to 15 January 2026. The 'Rank Change' column provides an indication of the change in demand within each location based on the same 6 month period last year.

Location Rank Change
on Same Period
Last Year
Matching
Permanent
IT Job Ads
Median Salary
Past 6 Months
Median Salary
% Change
on Same Period
Last Year
Live
Jobs
Devon - 9 - -
Project Controller
England