Project Controller Jobs in the UK excluding London

Project Controller
UK > UK excluding London

The median Project Controller salary in the UK excluding London is £55,000 per year, according to job vacancies posted during the 6 months leading to 29 May 2025.

The table below provides salary benchmarking and summary statistics, comparing them to the same period in the previous two years.

6 months to
29 May 2025
Same period 2024 Same period 2023
Rank 579 699 745
Rank change year-on-year +120 +46 +113
Permanent jobs requiring a Project Controller 1 76 10
As % of all permanent jobs advertised in the UK excluding London 0.003% 0.10% 0.017%
As % of the Job Titles category 0.003% 0.11% 0.019%
Number of salaries quoted 1 24 9
10th Percentile - - £37,000
25th Percentile - - £38,750
Median annual salary (50th Percentile) £55,000 £42,300 £40,403
Median % change year-on-year +30.02% +4.70% -6.04%
75th Percentile - - £43,750
90th Percentile - £46,785 £46,100
UK median annual salary £53,500 £42,300 £40,201
% change year-on-year +26.48% +5.22% -6.51%

All Permanent IT Job Vacancies
UK excluding London

For comparison with the information above, the following table provides summary statistics for all permanent IT job vacancies in the UK excluding London. Most job vacancies include a discernible job title that can be normalized. As such, the figures in the second row provide an indication of the number of permanent jobs in our overall sample.

Permanent vacancies in the UK excluding London with a recognized job title 35,218 70,245 51,745
% of permanent jobs with a recognized job title 90.32% 94.92% 89.08%
Number of salaries quoted 17,732 49,603 29,711
10th Percentile £26,500 £26,750 £29,750
25th Percentile £37,000 £35,000 £38,750
Median annual salary (50th Percentile) £51,000 £50,000 £53,500
Median % change year-on-year +2.00% -6.54% +6.63%
75th Percentile £65,000 £63,750 £68,750
90th Percentile £77,500 £76,250 £81,250
UK median annual salary £55,000 £52,500 £60,000
% change year-on-year +4.76% -12.50% -

Project Controller
Job Vacancy Trend in the UK excluding London

Job postings that featured Project Controller in the job title as a proportion of all IT jobs advertised in the UK excluding London.

Job vacancy trend for Project Controller in the UK excluding London

Project Controller
Salary Trend in the UK excluding London

3-month moving average salary quoted in jobs citing Project Controller in the UK excluding London.

Salary trend for Project Controller in the UK excluding London

Project Controller
Job Locations in the UK excluding London

The table below looks at the demand and provides a guide to the median salaries quoted in IT jobs citing Project Controller within the UK excluding London region over the 6 months to 29 May 2025. The 'Rank Change' column provides an indication of the change in demand within each location based on the same 6 month period last year.

Location Rank Change
on Same Period
Last Year
Matching
Permanent
IT Job Ads
Median Salary
Past 6 Months
Median Salary
% Change
on Same Period
Last Year
Live
Jobs
South West +117 1 £55,000 +10.00%
Project Controller
UK

Project Controller Skill Set
Top 5 Co-occurring Skills and Capabilities in the UK excluding London

For the 6 months to 29 May 2025, Project Controller job roles required the following skills and capabilities in order of popularity. The figures indicate the absolute number co-occurrences and as a proportion of all permanent job ads across the UK excluding London region featuring Project Controller in the job title.

1 1 (100.00%) SAP
1 1 (100.00%) ERP
1 1 (100.00%) Primavera
1 1 (100.00%) Aerospace
1 1 (100.00%) Cost Management

Project Controller Skill Set
Co-occurring Skills and Capabilities in the UK excluding London by Category

The follow tables expand on the table above by listing co-occurrences grouped by category. The same employment type, locality and period is covered with up to 20 co-occurrences shown in each of the following categories:

Business Applications
1 1 (100.00%) Primavera
General
1 1 (100.00%) Aerospace
Processes & Methodologies
1 1 (100.00%) Cost Management
1 1 (100.00%) ERP
Vendors
1 1 (100.00%) SAP