The table below provides summary statistics for contract job vacancies advertised in Basildon requiring Microsoft Project skills. It includes a benchmarking guide to the contractor rates offered in vacancies that cited Microsoft Project over the 6 months leading up to 26 August 2025, comparing them to the same period in the previous two years.
Microsoft Project falls under the Software Applications category. For comparison with the information above, the following table provides summary statistics for all contract job vacancies requiring software application skills in Basildon.
DemandTrendContract vacancies with a requirement for software application skills
3
0
2
As % of all contract IT jobs advertised in Basildon
11.11%
-
6.67%
Number of daily rates quoted
3
0
2
10th Percentile
£229
-
£214
25th Percentile
£279
-
£222
Median daily rate (50th Percentile)
£375
-
£245
Median % change year-on-year
-
-
-13.03%
75th Percentile
£399
-
£268
90th Percentile
£407
-
£277
Essex median daily rate
£300
£275
£380
% change year-on-year
+9.09%
-27.63%
-18.93%
Microsoft Project Job Vacancy Trend in Basildon
Job postings citing Microsoft Project as a proportion of all IT jobs advertised in Basildon.
Microsoft Project Daily Rate Trend in Basildon
Contractor daily rate distribution trend for jobs in Basildon citing Microsoft Project.
Microsoft Project Hourly Rate Trend in Basildon
Contractor hourly rate distribution trend for jobs in Basildon citing Microsoft Project.
Microsoft Project Top 19 Co-occurring Skills and Capabilities in Basildon
For the 6 months to 26 August 2025, contractor job vacancies citing Microsoft Project also mentioned the following skills and capabilities in order of popularity.
The figures indicate the absolute number co-occurrences and as a proportion of all contract job ads across the Basildon region with a requirement for Microsoft Project.
Microsoft Project Co-occurring Skills and Capabilities in Basildon by Category
The follow tables expand on the table above by listing co-occurrences grouped by category.
The same employment type, locality and period is covered with up to 20 co-occurrences shown in each of the following categories: