Work Breakdown Structure (WBS) Hampshire> Basingstoke
The table below provides summary statistics for contract job vacancies advertised in Basingstoke requiring Work Breakdown Structure skills. It includes a benchmarking guide to the contractor rates offered in vacancies that cited Work Breakdown Structure over the 6 months leading up to 26 August 2025, comparing them to the same period in the previous two years.
6 months to 26 Aug 2025
Same period 2024
Same period 2023
Rank
40
-
-
Rank change year-on-year
-
-
-
DemandTrendContract jobs citing Work Breakdown Structure
2
0
0
As % of all contract jobs advertised in Basingstoke
Work Breakdown Structure falls under the Processes and Methodologies category. For comparison with the information above, the following table provides summary statistics for all contract job vacancies requiring process or methodology skills in Basingstoke.
DemandTrendContract vacancies with a requirement for process or methodology skills
189
282
173
As % of all contract IT jobs advertised in Basingstoke
86.70%
75.20%
88.72%
Number of daily rates quoted
165
182
69
10th Percentile
£463
£414
£230
25th Percentile
£513
£475
£406
Median daily rate (50th Percentile)
£600
£625
£580
Median % change year-on-year
-4.00%
+7.76%
+10.48%
75th Percentile
£613
£700
£650
90th Percentile
£650
£725
£678
Hampshire median daily rate
£530
£575
£525
% change year-on-year
-7.83%
+9.52%
-
Number of hourly rates quoted
1
5
19
10th Percentile
-
-
£15.21
25th Percentile
-
£16.25
£15.36
Median hourly rate
£21.39
£35.00
£16.00
Median % change year-on-year
-38.89%
+118.75%
-27.27%
75th Percentile
-
£36.00
£19.00
90th Percentile
-
£48.90
£45.00
Hampshire median hourly rate
£33.05
£57.35
£52.50
% change year-on-year
-42.37%
+9.24%
+16.67%
Work Breakdown Structure Job Vacancy Trend in Basingstoke
Job postings citing Work Breakdown Structure as a proportion of all IT jobs advertised in Basingstoke.
Work Breakdown Structure Daily Rate Trend in Basingstoke
Contractor daily rate distribution trend for jobs in Basingstoke citing Work Breakdown Structure.
Work Breakdown Structure Top 9 Co-occurring Skills and Capabilities in Basingstoke
For the 6 months to 26 August 2025, contractor job vacancies citing Work Breakdown Structure also mentioned the following skills and capabilities in order of popularity.
The figures indicate the absolute number co-occurrences and as a proportion of all contract job ads across the Basingstoke region with a requirement for Work Breakdown Structure.
Work Breakdown Structure Co-occurring Skills and Capabilities in Basingstoke by Category
The follow tables expand on the table above by listing co-occurrences grouped by category.
The same employment type, locality and period is covered with up to 20 co-occurrences shown in each of the following categories: