The table below provides summary statistics and contractor rates for jobs advertised in Berkshire requiring Resource Levelling skills. It covers vacancies from the 6 months leading up to 16 September 2025, with comparisons to the same periods in the previous two years.
6 months to 16 Sep 2025 |
Same period 2024 | Same period 2023 | |
---|---|---|---|
Rank | 92 | - | - |
Rank change year-on-year | - | - | - |
Contract jobs citing Resource Levelling | 3 | 0 | 0 |
As % of all contract jobs advertised in Berkshire | 0.26% | - | - |
As % of the Processes & Methodologies category | 0.28% | - | - |
Number of daily rates quoted | 0 | 0 | 0 |
Median daily rate (50th Percentile) | - | - | - |
South East median daily rate | £550 | - | - |
Number of hourly rates quoted | 1 | 0 | 0 |
10th Percentile | - | - | - |
25th Percentile | £46.24 | - | - |
Median hourly rate | £47.48 | - | - |
75th Percentile | £48.71 | - | - |
90th Percentile | - | - | - |
South East median hourly rate | £47.48 | - | - |
All Process and Methodology Skills
Berkshire
Resource Levelling falls under the Processes and Methodologies category. For comparison with the information above, the following table provides summary statistics for all contract job vacancies requiring process or methodology skills in Berkshire.
Contract vacancies with a requirement for process or methodology skills | 1,060 | 1,466 | 1,616 |
As % of all contract IT jobs advertised in Berkshire | 91.46% | 87.05% | 89.78% |
Number of daily rates quoted | 659 | 756 | 1,016 |
10th Percentile | £325 | £325 | £300 |
25th Percentile | £413 | £450 | £413 |
Median daily rate (50th Percentile) | £508 | £550 | £525 |
Median % change year-on-year | -7.73% | +4.76% | +5.00% |
75th Percentile | £600 | £638 | £638 |
90th Percentile | £650 | £695 | £700 |
South East median daily rate | £500 | £513 | £518 |
% change year-on-year | -2.44% | -1.14% | +1.90% |
Number of hourly rates quoted | 40 | 72 | 62 |
10th Percentile | £14.75 | £19.51 | £18.50 |
25th Percentile | £16.66 | £48.28 | £47.73 |
Median hourly rate | £32.18 | £61.60 | £59.38 |
Median % change year-on-year | -47.76% | +3.75% | +44.13% |
75th Percentile | £59.44 | £71.89 | £72.25 |
90th Percentile | £87.28 | £87.32 | £75.67 |
South East median hourly rate | £20.75 | £57.35 | £52.50 |
% change year-on-year | -63.82% | +9.24% | +61.54% |
Resource Levelling
Job Vacancy Trend in Berkshire
Job postings citing Resource Levelling as a proportion of all IT jobs advertised in Berkshire.

Resource Levelling
Daily Rate Trend in Berkshire
Contractor daily rate distribution trend for jobs in Berkshire citing Resource Levelling.

Resource Levelling
Contract Job Locations in Berkshire
The table below looks at the demand and provides a guide to the median contractor rates quoted in IT jobs citing Resource Levelling within the Berkshire region over the 6 months to 16 September 2025. The 'Rank Change' column provides an indication of the change in demand within each location based on the same 6 month period last year.
Location | Rank Change on Same Period Last Year |
Matching Contract IT Job Ads |
Median Daily Rate Past 6 Months |
Median Daily Rate % Change on Same Period Last Year |
Live Jobs |
---|---|---|---|---|---|
Reading | - | 1 | - | - | |
Resource Levelling South East |
Resource Levelling
Co-occurring Skills and Capabilities in Berkshire by Category
The follow tables expand on the table above by listing co-occurrences grouped by category. The same employment type, locality and period is covered with up to 20 co-occurrences shown in each of the following categories:
|
|
|||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||
|
|