Risk Register
East of England > Cambridgeshire
The table below provides summary statistics for contract job vacancies advertised in Cambridgeshire requiring Risk Register skills. It includes a benchmarking guide to the contractor rates offered in vacancies that cited Risk Register over the 6 months leading up to 5 July 2025, comparing them to the same period in the previous two years.
6 months to 5 Jul 2025 |
Same period 2024 | Same period 2023 | |
---|---|---|---|
Rank | 39 | - | 51 |
Rank change year-on-year | - | - | +24 |
Contract jobs citing Risk Register | 1 | 0 | 2 |
As % of all contract jobs advertised in Cambridgeshire | 0.32% | - | 0.36% |
As % of the Processes & Methodologies category | 0.36% | - | 0.40% |
Number of daily rates quoted | 0 | 0 | 2 |
10th Percentile | - | - | - |
25th Percentile | - | - | £438 |
Median daily rate (50th Percentile) | - | - | £475 |
75th Percentile | - | - | £513 |
90th Percentile | - | - | - |
East of England median daily rate | - | - | £475 |
% change year-on-year | - | - | -9.52% |
All Process and Methodology Skills
Cambridgeshire
Risk Register falls under the Processes and Methodologies category. For comparison with the information above, the following table provides summary statistics for all contract job vacancies requiring process or methodology skills in Cambridgeshire.
Contract vacancies with a requirement for process or methodology skills | 275 | 425 | 494 |
As % of all contract IT jobs advertised in Cambridgeshire | 88.14% | 83.01% | 89.33% |
Number of daily rates quoted | 131 | 146 | 249 |
10th Percentile | £250 | £203 | £223 |
25th Percentile | £369 | £316 | £338 |
Median daily rate (50th Percentile) | £475 | £420 | £450 |
Median % change year-on-year | +13.10% | -6.67% | - |
75th Percentile | £575 | £550 | £538 |
90th Percentile | £684 | £638 | £600 |
East of England median daily rate | £500 | £428 | £500 |
% change year-on-year | +16.96% | -14.50% | +5.26% |
Number of hourly rates quoted | 58 | 179 | 169 |
10th Percentile | £14.84 | £14.16 | £13.41 |
25th Percentile | £14.99 | £14.84 | £14.25 |
Median hourly rate | £16.30 | £16.23 | £14.50 |
Median % change year-on-year | +0.43% | +11.93% | - |
75th Percentile | £20.88 | £25.00 | £20.56 |
90th Percentile | £43.75 | £54.50 | £23.05 |
East of England median hourly rate | £32.07 | £40.00 | £21.00 |
% change year-on-year | -19.83% | +90.48% | +7.69% |
Risk Register
Job Vacancy Trend in Cambridgeshire
Job postings citing Risk Register as a proportion of all IT jobs advertised in Cambridgeshire.

Risk Register
Contractor Daily Rate Trend in Cambridgeshire
3-month moving average daily rate quoted in jobs citing Risk Register in Cambridgeshire.
Risk Register
Contract Job Locations in Cambridgeshire
The table below looks at the demand and provides a guide to the median contractor rates quoted in IT jobs citing Risk Register within the Cambridgeshire region over the 6 months to 5 July 2025. The 'Rank Change' column provides an indication of the change in demand within each location based on the same 6 month period last year.
Location | Rank Change on Same Period Last Year |
Matching Contract IT Job Ads |
Median Daily Rate Past 6 Months |
Median Daily Rate % Change on Same Period Last Year |
Live Jobs |
---|---|---|---|---|---|
Cambridge | - | 1 | - | - | 1 |
Risk Register East of England |
Risk Register
Co-occurring Skills and Capabilities in Cambridgeshire by Category
The follow tables expand on the table above by listing co-occurrences grouped by category. The same employment type, locality and period is covered with up to 20 co-occurrences shown in each of the following categories: