The table below provides summary statistics for contract job vacancies advertised in Cheshire requiring Work Breakdown Structure skills. It includes a benchmarking guide to the contractor rates offered in vacancies that cited Work Breakdown Structure over the 6 months leading up to 1 May 2025, comparing them to the same period in the previous two years.

6 months to
1 May 2025
Same period 2024 Same period 2023
Rank 57 57 -
Rank change year-on-year 0 - -
Contract jobs citing Work Breakdown Structure 1 1 0
As % of all contract jobs advertised in Cheshire 0.22% 0.20% -
As % of the Processes & Methodologies category 0.23% 0.24% -
Number of daily rates quoted 0 0 0
Median daily rate (50th Percentile) - - -
North West median daily rate - - -

All Process and Methodology Skills
Cheshire

Work Breakdown Structure falls under the Processes and Methodologies category. For comparison with the information above, the following table provides summary statistics for all contract job vacancies requiring process or methodology skills in Cheshire.

Contract vacancies with a requirement for process or methodology skills 436 425 483
As % of all contract IT jobs advertised in Cheshire 97.10% 84.33% 91.13%
Number of daily rates quoted 294 285 328
10th Percentile £317 £276 £275
25th Percentile £358 £400 £400
Median daily rate (50th Percentile) £455 £500 £475
Median % change year-on-year -9.05% +5.26% +5.56%
75th Percentile £550 £580 £575
90th Percentile £638 £635 £660
North West median daily rate £475 £500 £500
% change year-on-year -5.00% - +5.26%
Number of hourly rates quoted 28 30 23
10th Percentile £19.00 £13.70 £19.06
25th Percentile £25.94 £16.61 £23.15
Median hourly rate £35.20 £26.66 £30.54
Median % change year-on-year +32.03% -12.70% +29.96%
75th Percentile £85.44 £42.31 £35.00
90th Percentile £86.00 £44.13 £39.20
North West median hourly rate £31.88 £21.00 £35.00
% change year-on-year +51.81% -40.00% +70.82%

Work Breakdown Structure
Job Vacancy Trend in Cheshire

Job postings citing Work Breakdown Structure as a proportion of all IT jobs advertised in Cheshire.

Job vacancy trend for Work Breakdown Structure in Cheshire

Work Breakdown Structure
Contractor Daily Rate Trend in Cheshire

3-month moving average daily rate quoted in jobs citing Work Breakdown Structure in Cheshire.

Daily rate trend for Work Breakdown Structure in Cheshire

Work Breakdown Structure
Contractor Hourly Rate Trend in Cheshire

3-month moving average hourly rates quoted in jobs citing Work Breakdown Structure in Cheshire.

Hourly rate trend for Work Breakdown Structure in Cheshire

Work Breakdown Structure
Contract Job Locations in Cheshire

The table below looks at the demand and provides a guide to the median contractor rates quoted in IT jobs citing Work Breakdown Structure within the Cheshire region over the 6 months to 1 May 2025. The 'Rank Change' column provides an indication of the change in demand within each location based on the same 6 month period last year.

Location Rank Change
on Same Period
Last Year
Matching
Contract
IT Job Ads
Median
Daily Rate
Past 6 Months
Median Daily Rate
% Change
on Same Period
Last Year
Live
Jobs
Crewe - 1 - -
Work Breakdown Structure
North West

Work Breakdown Structure
Co-occurring Skills and Capabilities in Cheshire by Category

The follow tables expand on the table above by listing co-occurrences grouped by category. The same employment type, locality and period is covered with up to 20 co-occurrences shown in each of the following categories:

Application Platforms
1 1 (100.00%) Confluence
Development Applications
1 1 (100.00%) JIRA
Job Titles
1 1 (100.00%) IT Manager
1 1 (100.00%) IT Project Manager
1 1 (100.00%) Project Manager
Processes & Methodologies
1 1 (100.00%) Agile
1 1 (100.00%) Cost-Benefit Analysis
1 1 (100.00%) Gantt Chart
1 1 (100.00%) PRINCE2
1 1 (100.00%) Project Delivery
1 1 (100.00%) Project Management
1 1 (100.00%) Scaled Agile Framework
1 1 (100.00%) Scrum
1 1 (100.00%) Stakeholder Analysis
1 1 (100.00%) SWOT Analysis
1 1 (100.00%) Waterfall