Risk Register Contracts in the City of Westminster

Risk Register
Central London > City of Westminster

The table below provides summary statistics for contract job vacancies advertised in the City of Westminster requiring Risk Register skills. It includes a benchmarking guide to the contractor rates offered in vacancies that cited Risk Register over the 6 months leading up to 6 July 2025, comparing them to the same period in the previous two years.

6 months to
6 Jul 2025
Same period 2024 Same period 2023
Rank 10 - -
Rank change year-on-year - - -
Contract jobs citing Risk Register 2 0 0
As % of all contract jobs advertised in the City of Westminster 4.55% - -
As % of the Processes & Methodologies category 5.26% - -
Number of daily rates quoted 2 0 0
Median daily rate (50th Percentile) £650 - -
Central London median daily rate £575 £505 £600
% change year-on-year +13.86% -15.83% +9.09%

All Process and Methodology Skills
City of Westminster

Risk Register falls under the Processes and Methodologies category. For comparison with the information above, the following table provides summary statistics for all contract job vacancies requiring process or methodology skills in the City of Westminster.

Contract vacancies with a requirement for process or methodology skills 38 47 40
As % of all contract IT jobs advertised in the City of Westminster 86.36% 92.16% 85.11%
Number of daily rates quoted 29 34 33
10th Percentile £374 £440 £248
25th Percentile £409 £466 £370
Median daily rate (50th Percentile) £575 £550 £570
Median % change year-on-year +4.55% -3.42% +3.55%
75th Percentile £650 £684 £825
90th Percentile £700 £795 £850
Central London median daily rate £551 £554 £600
% change year-on-year -0.45% -7.75% +5.26%
Number of hourly rates quoted 0 2 0
Median hourly rate - £40.00 -
Central London median hourly rate £32.50 £27.00 £35.00
% change year-on-year +20.37% -22.86% -18.13%

Risk Register
Job Vacancy Trend in the City of Westminster

Job postings citing Risk Register as a proportion of all IT jobs advertised in the City of Westminster.

Job vacancy trend for Risk Register in the City of Westminster

Risk Register
Contractor Daily Rate Trend in the City of Westminster

3-month moving average daily rate quoted in jobs citing Risk Register in the City of Westminster.

Daily rate trend for Risk Register in the City of Westminster

Risk Register
Contract Job Locations in the City of Westminster

The table below looks at the demand and provides a guide to the median contractor rates quoted in IT jobs citing Risk Register within the City of Westminster region over the 6 months to 6 July 2025. The 'Rank Change' column provides an indication of the change in demand within each location based on the same 6 month period last year.

Location Rank Change
on Same Period
Last Year
Matching
Contract
IT Job Ads
Median
Daily Rate
Past 6 Months
Median Daily Rate
% Change
on Same Period
Last Year
Live
Jobs
Westminster - 2 £650 - 2
Risk Register
Central London

Risk Register
Co-occurring Skills and Capabilities in the City of Westminster by Category

The follow tables expand on the table above by listing co-occurrences grouped by category. The same employment type, locality and period is covered with up to 20 co-occurrences shown in each of the following categories:

Cloud Services
1 2 (100.00%) AWS
1 2 (100.00%) Azure
1 2 (100.00%) GCP
Job Titles
1 2 (100.00%) Architect
1 2 (100.00%) Security Architect
Miscellaneous
1 2 (100.00%) Legacy Applications
1 2 (100.00%) Legacy Systems
Operating Systems
1 2 (100.00%) Linux
Processes & Methodologies
1 2 (100.00%) Architectural Patterns
1 2 (100.00%) CI/CD
1 2 (100.00%) Data Encryption
1 2 (100.00%) DevSecOps
1 2 (100.00%) Dynamic Application Security Testing
1 2 (100.00%) Migration
1 2 (100.00%) Network Segmentation
1 2 (100.00%) Remediation Plan
1 2 (100.00%) SABSA
1 2 (100.00%) Static Application Security Testing
1 2 (100.00%) Technical Debt
1 2 (100.00%) Threat Modelling
1 2 (100.00%) Vulnerability Management
Qualifications
1 2 (100.00%) (ISC)2 CCSP
1 2 (100.00%) CASP
1 2 (100.00%) CCSP
1 2 (100.00%) Cisco Certification
1 2 (100.00%) CISSP
1 2 (100.00%) CREST Certified
1 2 (100.00%) CSSLP
1 2 (100.00%) GIAC
Quality Assurance & Compliance
1 2 (100.00%) HMG Security Policy Framework
1 2 (100.00%) ISO/IEC 27001
1 2 (100.00%) NCSC
1 2 (100.00%) NIST
System Software
1 2 (100.00%) Active Directory
Systems Management
1 2 (100.00%) SELinux