Project Controller
North West > Cumbria
As of 22 May 2025, there is not enough information available from job vacancies posted within the last 6 months to determine the median Project Controller daily rate in Cumbria.
6 months to 22 May 2025 |
Same period 2024 | Same period 2023 | |
---|---|---|---|
Rank | 34 | - | - |
Rank change year-on-year | - | - | - |
Contract jobs requiring a Project Controller | 1 | 0 | 0 |
As % of all contract jobs advertised in Cumbria | 0.53% | - | - |
As % of the Job Titles category | 0.58% | - | - |
Number of daily rates quoted | 0 | 0 | 0 |
Median daily rate (50th Percentile) | - | - | - |
North West median daily rate | - | - | - |
Number of hourly rates quoted | 1 | 0 | 0 |
10th Percentile | - | - | - |
25th Percentile | £27.14 | - | - |
Median hourly rate | £29.27 | - | - |
75th Percentile | £31.41 | - | - |
90th Percentile | - | - | - |
North West median hourly rate | £50.99 | £60.00 | - |
% change year-on-year | -15.03% | - | - |
All Contract IT Job Vacancies
Cumbria
For comparison with the information above, the following table provides summary statistics for all contract IT job vacancies in Cumbria. Most job vacancies include a discernible job title that can be normalized. As such, the figures in the second row provide an indication of the number of contract jobs in our overall sample.
Contract vacancies in Cumbria with a recognized job title | 173 | 235 | 78 |
% of contract IT jobs with a recognized job title | 92.51% | 94.38% | 97.50% |
Number of daily rates quoted | 77 | 127 | 46 |
10th Percentile | £285 | £430 | £369 |
25th Percentile | £413 | £481 | £446 |
Median daily rate (50th Percentile) | £525 | £515 | £475 |
Median % change year-on-year | +1.94% | +8.42% | -0.52% |
75th Percentile | £600 | £666 | £487 |
90th Percentile | £638 | £725 | £575 |
North West median daily rate | £465 | £488 | £500 |
% change year-on-year | -4.62% | -2.50% | +5.26% |
Number of hourly rates quoted | 18 | 66 | 6 |
10th Percentile | £25.23 | - | £35.55 |
25th Percentile | £25.29 | £10.95 | £52.63 |
Median hourly rate | £41.84 | £21.00 | £69.45 |
Median % change year-on-year | +99.24% | -69.76% | +38.86% |
75th Percentile | £59.57 | £46.91 | £83.40 |
90th Percentile | £74.15 | £64.31 | - |
North West median hourly rate | £30.10 | £28.00 | £30.54 |
% change year-on-year | +7.50% | -8.32% | +31.51% |
Project Controller
Job Vacancy Trend in Cumbria
Job postings that featured Project Controller in the job title as a proportion of all IT jobs advertised in Cumbria.

Project Controller
Contract Job Locations in Cumbria
The table below looks at the demand and provides a guide to the median contractor rates quoted in IT jobs citing Project Controller within the Cumbria region over the 6 months to 22 May 2025. The 'Rank Change' column provides an indication of the change in demand within each location based on the same 6 month period last year.
Location | Rank Change on Same Period Last Year |
Matching Contract IT Job Ads |
Median Daily Rate Past 6 Months |
Median Daily Rate % Change on Same Period Last Year |
Live Jobs |
---|---|---|---|---|---|
Barrow-in-Furness | - | 1 | - | - | 1 |
Project Controller North West |
Project Controller Skill Set
Top 12 Co-occurring Skills and Capabilities in Cumbria
For the 6 months to 22 May 2025, Project Controller contract job roles required the following skills and capabilities in order of popularity. The figures indicate the absolute number co-occurrences and as a proportion of all contract job ads across the Cumbria region featuring Project Controller in the job title.
|
Project Controller Skill Set
Co-occurring Skills and Capabilities in Cumbria by Category
The follow tables expand on the table above by listing co-occurrences grouped by category. The same employment type, locality and period is covered with up to 20 co-occurrences shown in each of the following categories:
|
|
|||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||
|