Project Controller
UK > England
The median Project Controller daily rate in England is £345, according to job vacancies posted in the 6 months leading up to 19 October 2025.
The table below compares current contractor rates and summary statistics with the previous two years.
6 months to 19 Oct 2025 |
Same period 2024 | Same period 2023 | |
---|---|---|---|
Rank | 512 | 518 | 567 |
Rank change year-on-year | +6 | +49 | +187 |
Contract jobs requiring a Project Controller | 6 | 12 | 17 |
As % of all contract jobs in England | 0.021% | 0.038% | 0.041% |
As % of the Job Titles category | 0.023% | 0.041% | 0.044% |
Number of daily rates quoted | 1 | 6 | 9 |
10th Percentile | - | £254 | £262 |
25th Percentile | - | £309 | £320 |
Median daily rate (50th Percentile) | £345 | £320 | £350 |
Median % change year-on-year | +7.81% | -8.57% | +11.55% |
75th Percentile | - | - | £400 |
90th Percentile | - | £391 | £436 |
UK median daily rate | £345 | £320 | £350 |
% change year-on-year | +7.81% | -8.57% | +11.55% |
Number of hourly rates quoted | 4 | 3 | 5 |
10th Percentile | - | £29.40 | - |
25th Percentile | £27.14 | £31.50 | £35.00 |
Median hourly rate | £32.64 | £35.00 | £50.00 |
Median % change year-on-year | -6.76% | -30.00% | +53.85% |
75th Percentile | £40.87 | - | - |
90th Percentile | £49.64 | - | £59.00 |
UK median hourly rate | £32.64 | £35.00 | £50.00 |
% change year-on-year | -6.76% | -30.00% | +53.85% |
All Contract IT Job Vacancies
England
For comparison with the information above, the following table provides summary statistics for all contract IT job vacancies in England. Most job vacancies include a discernible job title that can be normalized. As such, the figures in the second row provide an indication of the number of contract jobs in our overall sample.
Contract vacancies in England with a recognized job title | 25,631 | 29,616 | 38,608 |
% of contract IT jobs with a recognized job title | 91.09% | 93.01% | 93.94% |
Number of daily rates quoted | 16,462 | 18,072 | 26,930 |
10th Percentile | £280 | £300 | £300 |
25th Percentile | £403 | £413 | £420 |
Median daily rate (50th Percentile) | £512 | £525 | £540 |
Median % change year-on-year | -2.43% | -2.78% | -1.82% |
75th Percentile | £625 | £638 | £650 |
90th Percentile | £725 | £750 | £750 |
UK median daily rate | £500 | £525 | £525 |
% change year-on-year | -4.76% | - | -4.55% |
Number of hourly rates quoted | 1,467 | 1,212 | 1,422 |
10th Percentile | £13.82 | £15.10 | £15.25 |
25th Percentile | £17.30 | £21.25 | £19.25 |
Median hourly rate | £25.15 | £43.00 | £46.18 |
Median % change year-on-year | -41.51% | -6.89% | +62.04% |
75th Percentile | £50.75 | £67.50 | £65.00 |
90th Percentile | £70.00 | £74.99 | £77.50 |
UK median hourly rate | £25.15 | £40.16 | £45.00 |
% change year-on-year | -37.38% | -10.75% | +68.35% |
Project Controller
Job Vacancy Trend in England
Historical trend showing the proportion of contract IT job postings featuring 'Project Controller' in the job title relative to all contract IT jobs advertised in England.

Project Controller
Daily Rate Trend in England
Contractor daily rate distribution trend for Project Controller job vacancies in England.

Project Controller
Hourly Rate Trend in England
Contractor hourly rate distribution trend for Project Controller job vacancies in England.

Project Controller
Hourly Rate Histogram in England
Hourly rate distribution of jobs citing Project Controller in England over the 6 months to 19 October 2025.
Project Controller
Contract Job Locations in England
The table below looks at the demand and provides a guide to the median contractor rates quoted in IT jobs citing Project Controller within the England region over the 6 months to 19 October 2025. The 'Rank Change' column provides an indication of the change in demand within each location based on the same 6 month period last year.
Location | Rank Change on Same Period Last Year |
Matching Contract IT Job Ads |
Median Daily Rate Past 6 Months |
Median Daily Rate % Change on Same Period Last Year |
Live Jobs |
---|---|---|---|---|---|
North of England | -25 | 5 | £345 | +53.33% | 1 |
North West | -13 | 3 | - | - | 1 |
Yorkshire | - | 2 | £345 | - | |
East of England | -8 | 1 | - | - | |
Project Controller UK |
Project Controller Skill Set
Top 23 Co-Occurring Skills & Capabilities in England
For the 6 months to 19 October 2025, Project Controller contract job roles required the following skills and capabilities in order of popularity. The figures indicate the absolute number of co-occurrences and as a proportion of all contract job ads across the England region featuring Project Controller in the job title.
|
|
Project Controller Skill Set
Co-Occurring Skills & Capabilities in England by Category
The following tables expand on the one above by listing co-occurrences grouped by category. They cover the same employment type, locality and period, with up to 20 co-occurrences shown in each category:
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|