Project Controller Contracts in Yorkshire

Project Controller
England > Yorkshire

The median Project Controller daily rate in Yorkshire is £345, according to job vacancies posted in the 6 months leading up to 22 August 2025.

The table below provides contractor rate benchmarking and summary statistics, comparing them to the same period in the previous two years.

6 months to
22 Aug 2025
Same period 2024 Same period 2023
Rank 109 - -
Rank change year-on-year - - -
DemandTrendContract jobs requiring a Project Controller 2 0 0
As % of all contract jobs advertised in Yorkshire 0.13% - -
As % of the Job Titles category 0.14% - -
Number of daily rates quoted 1 0 0
Median daily rate (50th Percentile) £345 - -
England median daily rate £345 £310 £400
% change year-on-year +11.29% -22.50% +42.98%

All DemandTrendContract IT Job Vacancies
Yorkshire

For comparison with the information above, the following table provides summary statistics for all contract IT job vacancies in Yorkshire. Most job vacancies include a discernible job title that can be normalized. As such, the figures in the second row provide an indication of the number of contract jobs in our overall sample.

DemandTrendContract vacancies in Yorkshire with a recognized job title 1,421 1,371 1,938
% of contract IT jobs with a recognized job title 93.43% 89.90% 96.75%
Number of daily rates quoted 919 856 1,273
10th Percentile £256 £288 £219
25th Percentile £375 £406 £413
Median daily rate (50th Percentile) £475 £500 £525
Median % change year-on-year -5.00% -4.76% +5.00%
75th Percentile £550 £580 £613
90th Percentile £618 £659 £700
England median daily rate £510 £525 £550
% change year-on-year -2.86% -4.55% -
Number of hourly rates quoted 53 57 36
10th Percentile £17.27 £13.50 £12.14
25th Percentile £18.35 £16.25 £15.64
Median hourly rate £22.14 £20.74 £20.25
Median % change year-on-year +6.75% +2.42% +6.58%
75th Percentile £52.50 £38.75 £23.75
90th Percentile £81.25 £48.75 £44.25
England median hourly rate £25.15 £45.00 £42.50
% change year-on-year -44.11% +5.88% +65.50%

Project Controller
Job Vacancy Trend in Yorkshire

Job postings that featured Project Controller in the job title as a proportion of all IT jobs advertised in Yorkshire.

Job vacancy trend for Project Controller in Yorkshire

Project Controller
DemandTrendContract Job Locations in Yorkshire

The table below looks at the demand and provides a guide to the median contractor rates quoted in IT jobs citing Project Controller within the Yorkshire region over the 6 months to 22 August 2025. The 'Rank Change' column provides an indication of the change in demand within each location based on the same 6 month period last year.

Location Rank Change
on Same Period
Last Year
Matching
DemandTrendContract
IT Job Ads
Median
Daily Rate
Past 6 Months
Median Daily Rate
% Change
on Same Period
Last Year
Live
Jobs
South Yorkshire - 2 £345 -
Project Controller
England

Project Controller Skill Set
Top 4 Co-occurring Skills and Capabilities in Yorkshire

For the 6 months to 22 August 2025, Project Controller contract job roles required the following skills and capabilities in order of popularity. The figures indicate the absolute number co-occurrences and as a proportion of all contract job ads across the Yorkshire region featuring Project Controller in the job title.

1 2 (100.00%) Project Management
1 2 (100.00%) Risk Management
1 2 (100.00%) Finance
1 2 (100.00%) Aerospace

Project Controller Skill Set
Co-occurring Skills and Capabilities in Yorkshire by Category

The follow tables expand on the table above by listing co-occurrences grouped by category. The same employment type, locality and period is covered with up to 20 co-occurrences shown in each of the following categories:

General
1 2 (100.00%) Aerospace
1 2 (100.00%) Finance
Processes & Methodologies
1 2 (100.00%) Project Management
1 2 (100.00%) Risk Management