Work Breakdown Structure (WBS)
Hampshire > Fareham
The table below provides summary statistics for contract job vacancies advertised in Fareham requiring Work Breakdown Structure skills. It includes a benchmarking guide to the contractor rates offered in vacancies that cited Work Breakdown Structure over the 6 months leading up to 1 May 2025, comparing them to the same period in the previous two years.
6 months to 1 May 2025 |
Same period 2024 | Same period 2023 | |
---|---|---|---|
Rank | 8 | 5 | - |
Rank change year-on-year | -3 | - | - |
Contract jobs citing Work Breakdown Structure | 1 | 2 | 0 |
As % of all contract jobs advertised in Fareham | 4.76% | 11.76% | - |
As % of the Processes & Methodologies category | 4.76% | 13.33% | - |
Number of daily rates quoted | 1 | 1 | 0 |
Median daily rate (50th Percentile) | £372 | £372 | - |
Hampshire median daily rate | £371 | £373 | £450 |
% change year-on-year | -0.67% | -17.03% | - |
All Process and Methodology Skills
Fareham
Work Breakdown Structure falls under the Processes and Methodologies category. For comparison with the information above, the following table provides summary statistics for all contract job vacancies requiring process or methodology skills in Fareham.
Contract vacancies with a requirement for process or methodology skills | 21 | 15 | 98 |
As % of all contract IT jobs advertised in Fareham | 100.00% | 88.24% | 89.09% |
Number of daily rates quoted | 16 | 5 | 46 |
10th Percentile | £256 | £366 | £144 |
25th Percentile | £261 | £372 | £200 |
Median daily rate (50th Percentile) | £406 | £375 | £525 |
Median % change year-on-year | +8.13% | -28.57% | +23.53% |
75th Percentile | £479 | £575 | £719 |
90th Percentile | £569 | £620 | £781 |
Hampshire median daily rate | £550 | £581 | £525 |
% change year-on-year | -5.25% | +10.57% | +5.00% |
Number of hourly rates quoted | 1 | 5 | 18 |
10th Percentile | - | - | £15.94 |
25th Percentile | £15.25 | - | £18.25 |
Median hourly rate | £15.50 | £13.05 | £18.50 |
Median % change year-on-year | +18.77% | -29.46% | -5.23% |
75th Percentile | £15.75 | - | £19.98 |
90th Percentile | - | £14.82 | £20.47 |
Hampshire median hourly rate | £57.63 | £57.35 | £53.00 |
% change year-on-year | +0.48% | +8.21% | +113.80% |
Work Breakdown Structure
Job Vacancy Trend in Fareham
Job postings citing Work Breakdown Structure as a proportion of all IT jobs advertised in Fareham.

Work Breakdown Structure
Contractor Daily Rate Trend in Fareham
3-month moving average daily rate quoted in jobs citing Work Breakdown Structure in Fareham.
Work Breakdown Structure
Co-occurring Skills and Capabilities in Fareham by Category
The follow tables expand on the table above by listing co-occurrences grouped by category. The same employment type, locality and period is covered with up to 20 co-occurrences shown in each of the following categories:
|
|
||||||||||||||||||||||||
|