Critical Path Analysis Contracts in Kent

Critical Path Analysis
South East > Kent

The table below provides summary statistics for contract job vacancies advertised in Kent requiring Critical Path Analysis skills. It includes a benchmarking guide to the contractor rates offered in vacancies that cited Critical Path Analysis over the 6 months leading up to 1 May 2025, comparing them to the same period in the previous two years.

6 months to
1 May 2025
Same period 2024 Same period 2023
Rank 20 - -
Rank change year-on-year - - -
Contract jobs citing Critical Path Analysis 1 0 0
As % of all contract jobs advertised in Kent 0.95% - -
As % of the Processes & Methodologies category 1.05% - -
Number of daily rates quoted 1 0 0
10th Percentile - - -
25th Percentile £560 - -
Median daily rate (50th Percentile) £585 - -
75th Percentile £610 - -
90th Percentile - - -
South East median daily rate £372 £389 £450
% change year-on-year -4.47% -13.53% +5.88%

All Process and Methodology Skills
Kent

Critical Path Analysis falls under the Processes and Methodologies category. For comparison with the information above, the following table provides summary statistics for all contract job vacancies requiring process or methodology skills in Kent.

Contract vacancies with a requirement for process or methodology skills 95 133 166
As % of all contract IT jobs advertised in Kent 90.48% 65.84% 75.80%
Number of daily rates quoted 70 93 126
10th Percentile £199 £205 £122
25th Percentile £213 £263 £205
Median daily rate (50th Percentile) £333 £425 £350
Median % change year-on-year -21.76% +21.43% -19.08%
75th Percentile £545 £540 £514
90th Percentile £688 £656 £674
South East median daily rate £500 £500 £508
% change year-on-year - -1.53% +1.55%
Number of hourly rates quoted 6 13 6
10th Percentile £14.68 £11.47 £36.85
25th Percentile £17.52 £15.00 £41.16
Median hourly rate £21.43 £35.50 £52.28
Median % change year-on-year -39.63% -32.09% +47.07%
75th Percentile £22.61 £46.87 £57.44
90th Percentile £51.55 £62.96 £62.25
South East median hourly rate £28.00 £47.50 £50.00
% change year-on-year -41.05% -5.00% +122.22%

Critical Path Analysis
Job Vacancy Trend in Kent

Job postings citing Critical Path Analysis as a proportion of all IT jobs advertised in Kent.

Job vacancy trend for Critical Path Analysis in Kent

Critical Path Analysis
Contractor Daily Rate Trend in Kent

3-month moving average daily rate quoted in jobs citing Critical Path Analysis in Kent.

Daily rate trend for Critical Path Analysis in Kent

Critical Path Analysis
Contract Job Locations in Kent

The table below looks at the demand and provides a guide to the median contractor rates quoted in IT jobs citing Critical Path Analysis within the Kent region over the 6 months to 1 May 2025. The 'Rank Change' column provides an indication of the change in demand within each location based on the same 6 month period last year.

Location Rank Change
on Same Period
Last Year
Matching
Contract
IT Job Ads
Median
Daily Rate
Past 6 Months
Median Daily Rate
% Change
on Same Period
Last Year
Live
Jobs
Stansted - 1 £585 -
Critical Path Analysis
South East

Critical Path Analysis
Co-occurring Skills and Capabilities in Kent by Category

The follow tables expand on the table above by listing co-occurrences grouped by category. The same employment type, locality and period is covered with up to 20 co-occurrences shown in each of the following categories:

Business Applications
1 1 (100.00%) Primavera
Job Titles
1 1 (100.00%) Senior
Miscellaneous
1 1 (100.00%) Management Information System
Processes & Methodologies
1 1 (100.00%) Customer Requirements
1 1 (100.00%) Earned Value Management
1 1 (100.00%) Product Breakdown Structure
1 1 (100.00%) Project Management
1 1 (100.00%) Work Breakdown Structure
Qualifications
1 1 (100.00%) Security Cleared