Project Controller Contracts in the Midlands

Project Controller
England > Midlands

As of 1 May 2025, there is not enough information available from job vacancies posted within the last 6 months to determine the median Project Controller daily rate in the Midlands.

6 months to
1 May 2025
Same period 2024 Same period 2023
Rank 110 - -
Rank change year-on-year - - -
Contract jobs requiring a Project Controller 1 0 0
As % of all contract jobs advertised in the Midlands 0.052% - -
As % of the Job Titles category 0.058% - -
Number of daily rates quoted 0 0 0
Median daily rate (50th Percentile) - - -
England median daily rate £500 £310 £538
% change year-on-year +61.29% -42.33% +115.43%

All Contract IT Job Vacancies
Midlands

For comparison with the information above, the following table provides summary statistics for all contract IT job vacancies in the Midlands. Most job vacancies include a discernible job title that can be normalized. As such, the figures in the second row provide an indication of the number of contract jobs in our overall sample.

Contract vacancies in the Midlands with a recognized job title 1,725 2,532 3,256
% of contract IT jobs with a recognized job title 90.13% 91.84% 94.60%
Number of daily rates quoted 1,147 1,707 2,290
10th Percentile £200 £213 £223
25th Percentile £356 £325 £363
Median daily rate (50th Percentile) £475 £475 £475
Median % change year-on-year - - +3.26%
75th Percentile £552 £588 £588
90th Percentile £638 £688 £675
England median daily rate £525 £525 £550
% change year-on-year - -4.55% +4.76%
Number of hourly rates quoted 106 213 128
10th Percentile £12.62 £11.84 £12.35
25th Percentile £14.00 £14.27 £15.21
Median hourly rate £18.82 £19.59 £20.00
Median % change year-on-year -3.94% -2.05% +16.33%
75th Percentile £28.18 £35.00 £28.88
90th Percentile £35.58 £54.60 £61.50
England median hourly rate £30.62 £36.31 £45.00
% change year-on-year -15.67% -19.32% +100.00%

Project Controller
Job Vacancy Trend in the Midlands

Job postings that featured Project Controller in the job title as a proportion of all IT jobs advertised in the Midlands.

Job vacancy trend for Project Controller in the Midlands

Project Controller
Contractor Daily Rate Trend in the Midlands

3-month moving average daily rate quoted in jobs citing Project Controller in the Midlands.

Daily rate trend for Project Controller in the Midlands

Project Controller
Contractor Hourly Rate Trend in the Midlands

3-month moving average hourly rates quoted in jobs citing Project Controller in the Midlands.

Hourly rate trend for Project Controller in the Midlands

Project Controller
Contract Job Locations in the Midlands

The table below looks at the demand and provides a guide to the median contractor rates quoted in IT jobs citing Project Controller within the Midlands region over the 6 months to 1 May 2025. The 'Rank Change' column provides an indication of the change in demand within each location based on the same 6 month period last year.

Location Rank Change
on Same Period
Last Year
Matching
Contract
IT Job Ads
Median
Daily Rate
Past 6 Months
Median Daily Rate
% Change
on Same Period
Last Year
Live
Jobs
East Midlands - 1 - - 1
Project Controller
England

Project Controller Skill Set
Top 10 Co-occurring Skills and Capabilities in the Midlands

For the 6 months to 1 May 2025, Project Controller contract job roles required the following skills and capabilities in order of popularity. The figures indicate the absolute number co-occurrences and as a proportion of all contract job ads across the Midlands region featuring Project Controller in the job title.

1 1 (100.00%) Microsoft Excel
1 1 (100.00%) Business Intelligence
1 1 (100.00%) Change Management
1 1 (100.00%) Risk Management
1 1 (100.00%) Aerospace
1 1 (100.00%) Power BI
1 1 (100.00%) PMO
1 1 (100.00%) Power Platform
1 1 (100.00%) Social Skills
1 1 (100.00%) Presentation Skills

Project Controller Skill Set
Co-occurring Skills and Capabilities in the Midlands by Category

The follow tables expand on the table above by listing co-occurrences grouped by category. The same employment type, locality and period is covered with up to 20 co-occurrences shown in each of the following categories:

Applications
1 1 (100.00%) Microsoft Excel
Cloud Services
1 1 (100.00%) Power Platform
Database & Business Intelligence
1 1 (100.00%) Power BI
General
1 1 (100.00%) Aerospace
1 1 (100.00%) Presentation Skills
1 1 (100.00%) Social Skills
Processes & Methodologies
1 1 (100.00%) Business Intelligence
1 1 (100.00%) Change Management
1 1 (100.00%) Risk Management
Quality Assurance & Compliance
1 1 (100.00%) PMO