Project Controller Contract Job Trends in Somerset

Project Controller
South West > Somerset

As of 23 May 2026, there is not enough information available from job vacancies posted within the last 6 months to determine the median Project Controller daily rate in Somerset.

6 months to
23 May 2026
Same period 2025 Same period 2024
Rank 39 - -
Rank change year-on-year - - -
Contract jobs requiring a Project Controller 3 0 0
As % of all contract jobs in Somerset 0.86% - -
As % of the Job Titles category 0.93% - -
Number of daily rates quoted 0 0 0
Median daily rate (50th Percentile) - - -
South West median daily rate - - £310
% change year-on-year - - -42.33%

All Contract IT Job Roles
Somerset

For comparison with the information above, the following table provides summary statistics for all contract IT job vacancies in Somerset. Most job vacancies include a discernible job title that can be normalized. As such, the figures in the second row provide an indication of the number of contract jobs in our overall sample.

Contract vacancies in Somerset with a recognized job title 322 130 192
% of contract IT jobs with a recognized job title 92.80% 86.67% 92.31%
Number of daily rates quoted 165 90 119
10th Percentile £241 £261 £200
25th Percentile £319 £407 £313
Median daily rate (50th Percentile) £450 £523 £450
Median % change year-on-year -13.88% +16.11% -6.49%
75th Percentile £588 £675 £588
90th Percentile £639 £775 £606
South West median daily rate £525 £500 £514
% change year-on-year +5.00% -2.77% -2.05%
Number of hourly rates quoted 75 3 33
10th Percentile £18.50 £13.66 £12.30
25th Percentile £43.62 £15.48 £15.50
Median hourly rate £57.50 £18.51 £25.00
Median % change year-on-year +210.64% -25.96% -50.00%
75th Percentile £58.75 £19.76 £40.00
90th Percentile - £20.51 £58.60
South West median hourly rate £57.50 £58.75 £55.00
% change year-on-year -2.13% +6.82% -15.38%

Project Controller
Job Vacancy Trend in Somerset

Historical trend showing the proportion of contract IT job postings featuring 'Project Controller' in the job title relative to all contract IT jobs advertised in Somerset.

Project Controller job vacancy trend in Somerset

Project Controller
Hourly Rate Trend in Somerset

Contractor hourly rate distribution trend for Project Controller job vacancies in Somerset.

Contractor hourly rate distribution trend for Project Controller job vacancies in Somerset

Project Controller
Contract Job Locations in Somerset

The table below looks at the demand and provides a guide to the median contractor rates quoted in IT jobs citing Project Controller within the Somerset region over the 6 months to 23 May 2026. The 'Rank Change' column provides an indication of the change in demand within each location based on the same 6 month period last year.

Location Rank Change
on Same Period
Last Year
Matching
Contract
IT Job Ads
Median
Daily Rate
Past 6 Months
Median Daily Rate
% Change
on Same Period
Last Year
Live
Jobs
Yeovil - 3 - -
Project Controller
South West

Project Controller Skill Set
Top 4 Co-Occurring Skills & Capabilities in Somerset

For the 6 months to 23 May 2026, Project Controller contract job roles required the following skills and capabilities in order of popularity. The figures indicate the absolute number of co-occurrences and as a proportion of all contract job ads across the Somerset region featuring Project Controller in the job title.

1 3 (100.00%) Microsoft
1 3 (100.00%) Microsoft Project
1 3 (100.00%) SAP
1 3 (100.00%) Work Breakdown Structure

Project Controller Skill Set
Co-Occurring Skills & Capabilities in Somerset by Category

The following tables expand on the one above by listing co-occurrences grouped by category. They cover the same employment type, locality and period, with up to 20 co-occurrences shown in each category:

Applications
1 3 (100.00%) Microsoft Project
General
1 3 (100.00%) Aerospace
1 3 (100.00%) Analytical Skills
1 3 (100.00%) Finance
Processes & Methodologies
1 3 (100.00%) Work Breakdown Structure
Vendors
1 3 (100.00%) Microsoft
1 3 (100.00%) SAP