The median Project Planner daily rate in South Wales is £425, according to job vacancies posted in the 6 months leading up to 2 May 2025.
The table below provides contractor rate benchmarking and summary statistics, comparing them to the same period in the previous two years.
6 months to 2 May 2025 |
Same period 2024 | Same period 2023 | |
---|---|---|---|
Rank | 34 | - | - |
Rank change year-on-year | - | - | - |
Contract jobs requiring a Project Planner | 1 | 0 | 0 |
As % of all contract jobs advertised in South Wales | 0.41% | - | - |
As % of the Job Titles category | 0.44% | - | - |
Number of daily rates quoted | 1 | 0 | 0 |
Median daily rate (50th Percentile) | £425 | - | - |
Wales median daily rate | £425 | - | - |
All Contract IT Job Vacancies
South Wales
For comparison with the information above, the following table provides summary statistics for all contract IT job vacancies in South Wales. Most job vacancies include a discernible job title that can be normalized. As such, the figures in the second row provide an indication of the number of contract jobs in our overall sample.
Contract vacancies in South Wales with a recognized job title | 227 | 298 | 491 |
% of contract IT jobs with a recognized job title | 93.80% | 88.96% | 94.61% |
Number of daily rates quoted | 166 | 217 | 377 |
10th Percentile | £164 | £168 | £180 |
25th Percentile | £252 | £356 | £325 |
Median daily rate (50th Percentile) | £395 | £470 | £460 |
Median % change year-on-year | -15.96% | +2.17% | -3.16% |
75th Percentile | £492 | £563 | £575 |
90th Percentile | £619 | £646 | £650 |
Wales median daily rate | £400 | £460 | £450 |
% change year-on-year | -13.04% | +2.22% | -5.26% |
Number of hourly rates quoted | 21 | 21 | 26 |
10th Percentile | £16.00 | £11.75 | £13.00 |
25th Percentile | £18.51 | £15.20 | £16.98 |
Median hourly rate | £22.50 | £22.68 | £18.14 |
Median % change year-on-year | -0.79% | +25.03% | -8.89% |
75th Percentile | £41.25 | £53.75 | £19.98 |
90th Percentile | £45.00 | £87.80 | £49.38 |
Wales median hourly rate | £21.01 | £19.09 | £18.14 |
% change year-on-year | +10.09% | +5.21% | -8.89% |
Project Planner
Job Vacancy Trend in South Wales
Job postings that featured Project Planner in the job title as a proportion of all IT jobs advertised in South Wales.

Project Planner
Contractor Daily Rate Trend in South Wales
3-month moving average daily rate quoted in jobs citing Project Planner in South Wales.
Project Planner
Contractor Hourly Rate Trend in South Wales
3-month moving average hourly rates quoted in jobs citing Project Planner in South Wales.
Project Planner
Contract Job Locations in South Wales
The table below looks at the demand and provides a guide to the median contractor rates quoted in IT jobs citing Project Planner within the South Wales region over the 6 months to 2 May 2025. The 'Rank Change' column provides an indication of the change in demand within each location based on the same 6 month period last year.
Location | Rank Change on Same Period Last Year |
Matching Contract IT Job Ads |
Median Daily Rate Past 6 Months |
Median Daily Rate % Change on Same Period Last Year |
Live Jobs |
---|---|---|---|---|---|
Cardiff | - | 1 | £425 | - | |
Project Planner Wales |
Project Planner Skill Set
Top 3 Co-occurring Skills and Capabilities in South Wales
For the 6 months to 2 May 2025, Project Planner contract job roles required the following skills and capabilities in order of popularity. The figures indicate the absolute number co-occurrences and as a proportion of all contract job ads across the South Wales region featuring Project Planner in the job title.
|
Project Planner Skill Set
Co-occurring Skills and Capabilities in South Wales by Category