Project Control Manager Contracts

Project Control Manager
UK

The median Project Control Manager daily rate in the UK is £675, according to job vacancies posted in the 6 months leading up to 1 May 2025.

The table below provides contractor rate benchmarking and summary statistics, comparing them to the same period in the previous two years.

6 months to
1 May 2025
Same period 2024 Same period 2023
Rank 519 - 717
Rank change year-on-year - - +136
Contract jobs requiring a Project Control Manager 1 0 1
As % of all contract jobs advertised in the UK 0.003% - 0.002%
As % of the Job Titles category 0.004% - 0.002%
Number of daily rates quoted 1 0 1
10th Percentile - - -
25th Percentile £663 - £555
Median daily rate (50th Percentile) £675 - £560
Median % change year-on-year - - -3.66%
75th Percentile £688 - £565
90th Percentile - - -
UK excluding London median daily rate £675 - £560

All Contract IT Job Vacancies
UK

For comparison with the information above, the following table provides summary statistics for all contract IT job vacancies. Most job vacancies include a discernible job title that can be normalized. As such, the figures in the second row provide an indication of the number of contract jobs in our overall sample.

Contract vacancies in the UK with a recognized job title 27,084 40,415 56,464
% of contract IT jobs with a recognized job title 92.52% 92.78% 94.61%
Number of daily rates quoted 17,692 26,309 39,470
10th Percentile £300 £275 £313
25th Percentile £406 £410 £425
Median daily rate (50th Percentile) £515 £525 £540
Median % change year-on-year -1.90% -2.78% +2.86%
75th Percentile £625 £638 £650
90th Percentile £738 £750 £750
UK excluding London median daily rate £475 £492 £500
% change year-on-year -3.46% -1.60% +5.26%
Number of hourly rates quoted 1,035 2,664 1,570
10th Percentile £14.07 £12.86 £14.29
25th Percentile £18.50 £16.30 £19.50
Median hourly rate £29.00 £36.42 £45.00
Median % change year-on-year -20.37% -19.07% +91.49%
75th Percentile £62.50 £60.75 £65.75
90th Percentile £75.00 £72.50 £75.75
UK excluding London median hourly rate £28.00 £39.55 £42.50
% change year-on-year -29.20% -6.94% +117.95%

Project Control Manager
Job Vacancy Trend

Job postings that featured Project Control Manager in the job title as a proportion of all IT jobs advertised.

Job vacancy trend for Project Control Manager in the UK

Project Control Manager
Contractor Daily Rate Trend

3-month moving average daily rate quoted in jobs citing Project Control Manager.

Daily rate trend for Project Control Manager in the UK

Project Control Manager
Contractor Hourly Rate Trend

3-month moving average hourly rates quoted in jobs citing Project Control Manager.

Hourly rate trend for Project Control Manager in the UK

Project Control Manager
Top 2 Contract Locations

The table below looks at the demand and provides a guide to the median contractor rates quoted in IT jobs citing Project Control Manager within the UK over the 6 months to 1 May 2025. The 'Rank Change' column provides an indication of the change in demand within each location based on the same 6 month period last year.

Location Rank Change
on Same Period
Last Year
Matching
Contract
IT Job Ads
Median
Daily Rate
Past 6 Months
Median Daily Rate
% Change
on Same Period
Last Year
Live
Jobs
Scotland - 1 £675 -
UK excluding London - 1 £675 -

Project Control Manager Skill Set
Top 7 Co-occurring Skills and Capabilities

For the 6 months to 1 May 2025, Project Control Manager contract job roles required the following skills and capabilities in order of popularity. The figures indicate the absolute number co-occurrences and as a proportion of all contract job ads featuring Project Control Manager in the job title.

1 1 (100.00%) Primavera
1 1 (100.00%) Project Management
1 1 (100.00%) Risk Management
1 1 (100.00%) Project Planning
1 1 (100.00%) Change Control
1 1 (100.00%) PMO
1 1 (100.00%) Cost Control

Project Control Manager Skill Set
Co-occurring Skills and Capabilities by Category

The follow tables expand on the table above by listing co-occurrences grouped by category. The same employment type, locality and period is covered with up to 20 co-occurrences shown in each of the following categories:

Business Applications
1 1 (100.00%) Primavera
Processes & Methodologies
1 1 (100.00%) Change Control
1 1 (100.00%) Cost Control
1 1 (100.00%) Project Management
1 1 (100.00%) Project Planning
1 1 (100.00%) Risk Management
Quality Assurance & Compliance
1 1 (100.00%) PMO