The table below provides summary statistics for contract job vacancies advertised in West Malling requiring Microsoft Project skills. It includes a benchmarking guide to the contractor rates offered in vacancies that cited Microsoft Project over the 6 months leading up to 25 August 2025, comparing them to the same period in the previous two years.
6 months to 25 Aug 2025
Same period 2024
Same period 2023
Rank
5
-
-
Rank change year-on-year
-
-
-
DemandTrendContract jobs citing Microsoft Project
1
0
0
As % of all contract jobs advertised in West Malling
Microsoft Project falls under the Software Applications category. For comparison with the information above, the following table provides summary statistics for all contract job vacancies requiring software application skills in West Malling.
DemandTrendContract vacancies with a requirement for software application skills
1
0
0
As % of all contract IT jobs advertised in West Malling
16.67%
-
-
Number of daily rates quoted
1
0
0
10th Percentile
-
-
-
25th Percentile
£606
-
-
Median daily rate (50th Percentile)
£613
-
-
75th Percentile
£619
-
-
90th Percentile
-
-
-
Kent median daily rate
£155
£238
£200
% change year-on-year
-34.74%
+18.75%
+2.56%
Microsoft Project Job Vacancy Trend in West Malling
Job postings citing Microsoft Project as a proportion of all IT jobs advertised in West Malling.
Microsoft Project Daily Rate Trend in West Malling
Contractor daily rate distribution trend for jobs in West Malling citing Microsoft Project.
Microsoft Project Top 13 Co-occurring Skills and Capabilities in West Malling
For the 6 months to 25 August 2025, contractor job vacancies citing Microsoft Project also mentioned the following skills and capabilities in order of popularity.
The figures indicate the absolute number co-occurrences and as a proportion of all contract job ads across the West Malling region with a requirement for Microsoft Project.
Microsoft Project Co-occurring Skills and Capabilities in West Malling by Category
The follow tables expand on the table above by listing co-occurrences grouped by category.
The same employment type, locality and period is covered with up to 20 co-occurrences shown in each of the following categories: