The table below provides summary statistics for contract job vacancies advertised in Windsor requiring Project Planning skills. It includes a benchmarking guide to the contractor rates offered in vacancies that cited Project Planning over the 6 months leading up to 2 May 2025, comparing them to the same period in the previous two years.
Project Planning falls under the Processes and Methodologies category. For comparison with the information above, the following table provides summary statistics for all contract job vacancies requiring process or methodology skills in Windsor.
Contract vacancies with a requirement for process or methodology skills
60
23
9
As % of all contract IT jobs advertised in Windsor
100.00%
54.76%
69.23%
Number of daily rates quoted
43
15
4
10th Percentile
£451
£600
£234
25th Percentile
-
£656
£244
Median daily rate (50th Percentile)
£500
£675
£290
Median % change year-on-year
-25.93%
+132.76%
-31.76%
75th Percentile
£581
£750
£407
90th Percentile
£600
-
£545
Berkshire median daily rate
£500
£513
£525
% change year-on-year
-2.44%
-2.38%
+5.00%
Project Planning Job Vacancy Trend in Windsor
Job postings citing Project Planning as a proportion of all IT jobs advertised in Windsor.
Project Planning Contractor Daily Rate Trend in Windsor
3-month moving average daily rate quoted in jobs citing Project Planning in Windsor.
Project Planning Top 11 Co-occurring Skills and Capabilities in Windsor
For the 6 months to 2 May 2025, contractor job vacancies citing Project Planning also mentioned the following skills and capabilities in order of popularity.
The figures indicate the absolute number co-occurrences and as a proportion of all contract job ads across the Windsor region with a requirement for Project Planning.
Project Planning Co-occurring Skills and Capabilities in Windsor by Category
The follow tables expand on the table above by listing co-occurrences grouped by category.
The same employment type, locality and period is covered with up to 20 co-occurrences shown in each of the following categories: