The table below provides summary statistics for permanent job vacancies advertised in Barrow-in-Furness requiring Critical Path Analysis skills. It includes a benchmarking guide to the annual salaries offered in vacancies that cited Critical Path Analysis over the 6 months leading up to 6 May 2025, comparing them to the same period in the previous two years.
6 months to 6 May 2025
Same period 2024
Same period 2023
Rank
43
-
-
Rank change year-on-year
-
-
-
Permanent jobs citing Critical Path Analysis
2
0
0
As % of all permanent jobs advertised in Barrow-in-Furness
Critical Path Analysis falls under the Processes and Methodologies category. For comparison with the information above, the following table provides summary statistics for all permanent job vacancies requiring process or methodology skills in Barrow-in-Furness.
Permanent vacancies with a requirement for process or methodology skills
302
62
42
As % of all permanent jobs advertised in Barrow-in-Furness
96.49%
96.88%
100.00%
Number of salaries quoted
150
40
3
10th Percentile
£7,000
£24,200
-
25th Percentile
£40,000
£37,176
-
Median annual salary (50th Percentile)
£45,628
£38,734
£22,500
Median % change year-on-year
+17.80%
+72.15%
-35.71%
75th Percentile
£60,000
-
£41,875
90th Percentile
£70,371
-
£53,500
Cumbria median annual salary
£45,628
£42,500
£45,000
% change year-on-year
+7.36%
-5.56%
+28.57%
Critical Path Analysis Job Vacancy Trend in Barrow-in-Furness
Job postings citing Critical Path Analysis as a proportion of all IT jobs advertised in Barrow-in-Furness.
Critical Path Analysis Salary Trend in Barrow-in-Furness
3-month moving average salary quoted in jobs citing Critical Path Analysis in Barrow-in-Furness.
Critical Path Analysis Top 7 Co-occurring Skills and Capabilities in Barrow-in-Furness
For the 6 months to 6 May 2025, job vacancies citing Critical Path Analysis also mentioned the following skills and capabilities in order of popularity.
The figures indicate the absolute number co-occurrences and as a proportion of all permanent job ads across the Barrow-in-Furness region with a requirement for Critical Path Analysis.
Critical Path Analysis Co-occurring Skills and Capabilities in Barrow-in-Furness by Category
The follow tables expand on the table above by listing co-occurrences grouped by category.
The same employment type, locality and period is covered with up to 20 co-occurrences shown in each of the following categories: