Resource Planner
North West > Cumbria
The median Resource Planner salary in Cumbria is £30,000 per year, according to job vacancies posted during the 6 months leading to 22 September 2026.
The table below compares current salary benchmarking and summary statistics with the previous two years.
|
|
6 months to 22 Sep 2026 |
Same period 2025 | Same period 2024 |
|---|---|---|---|
| Rank | 38 | - | - |
| Rank change year-on-year | - | - | - |
| Permanent jobs requiring a Resource Planner | 1 | 0 | 0 |
| As % of all permanent jobs in Cumbria | 0.24% | - | - |
| As % of the Job Titles category | 0.27% | - | - |
| Number of salaries quoted | 1 | 0 | 0 |
| Median annual salary (50th Percentile) | £30,000 | - | - |
| North West median annual salary | £30,000 | - | - |
All Permanent IT Job Roles
Cumbria
For comparison with the information above, the following table provides summary statistics for all permanent IT job vacancies in Cumbria. Most job vacancies include a discernible job title that can be normalized. As such, the figures in the second row provide an indication of the number of permanent jobs in our overall sample.
| Permanent vacancies in Cumbria with a recognized job title | 375 | 260 | 497 |
| % of permanent jobs with a recognized job title | 91.02% | 89.04% | 96.69% |
| Number of salaries quoted | 267 | 133 | 332 |
| 10th Percentile | £30,000 | £25,087 | £29,550 |
| 25th Percentile | £35,000 | £35,000 | £35,000 |
| Median annual salary (50th Percentile) | £45,000 | £40,000 | £45,000 |
| Median % change year-on-year | +12.50% | -11.11% | +2.74% |
| 75th Percentile | £53,245 | £55,625 | £56,000 |
| 90th Percentile | £70,000 | £63,900 | £65,000 |
| North West median annual salary | £55,000 | £50,000 | £50,000 |
| % change year-on-year | +10.00% | - | -9.09% |
Resource Planner
Job Vacancy Trend in Cumbria
Historical trend showing the proportion of permanent IT job postings featuring 'Resource Planner' in the job title relative to all permanent IT jobs advertised in Cumbria.
Resource Planner
Job Locations in Cumbria
The table below looks at the demand and provides a guide to the median salaries quoted in IT jobs citing Resource Planner within the Cumbria region over the 6 months to 22 September 2026. The 'Rank Change' column provides an indication of the change in demand within each location based on the same 6 month period last year.
| Location | Rank Change on Same Period Last Year |
Matching Permanent IT Job Ads |
Median Salary Past 6 Months |
Median Salary % Change on Same Period Last Year |
Live Jobs |
|---|---|---|---|---|---|
| Carlisle | - | 1 | £30,000 | - | |
| Resource Planner North West |
|||||