Work Breakdown Structure (WBS)
North West > Cumbria
The table below provides summary statistics and salary benchmarking for jobs advertised in Cumbria requiring Work Breakdown Structure skills. It covers vacancies from the 6 months leading up to 19 September 2025, with comparisons to the same periods in the previous two years.
6 months to 19 Sep 2025 |
Same period 2024 | Same period 2023 | |
---|---|---|---|
Rank | 34 | 38 | - |
Rank change year-on-year | +4 | - | - |
Permanent jobs citing Work Breakdown Structure | 1 | 4 | 0 |
As % of all permanent jobs advertised in Cumbria | 0.34% | 0.76% | - |
As % of the Processes & Methodologies category | 0.39% | 1.23% | - |
Number of salaries quoted | 1 | 0 | 0 |
10th Percentile | - | - | - |
25th Percentile | £49,453 | - | - |
Median annual salary (50th Percentile) | £51,636 | - | - |
75th Percentile | £53,818 | - | - |
90th Percentile | - | - | - |
North West median annual salary | £51,636 | - | £46,250 |
% change year-on-year | - | - | +17.09% |
All Process and Methodology Skills
Cumbria
Work Breakdown Structure falls under the Processes and Methodologies category. For comparison with the information above, the following table provides summary statistics for all permanent job vacancies requiring process or methodology skills in Cumbria.
Permanent vacancies with a requirement for process or methodology skills | 254 | 325 | 162 |
As % of all permanent jobs advertised in Cumbria | 85.23% | 61.67% | 98.78% |
Number of salaries quoted | 134 | 170 | 46 |
10th Percentile | £25,087 | £29,500 | £26,000 |
25th Percentile | £35,000 | £35,802 | £32,753 |
Median annual salary (50th Percentile) | £40,000 | £48,000 | £43,800 |
Median % change year-on-year | -16.67% | +9.59% | +12.31% |
75th Percentile | £55,625 | £60,000 | £60,800 |
90th Percentile | £63,725 | £65,000 | £70,000 |
North West median annual salary | £50,000 | £50,309 | £55,000 |
% change year-on-year | -0.61% | -8.53% | +4.76% |
Work Breakdown Structure
Job Vacancy Trend in Cumbria
Job postings citing Work Breakdown Structure as a proportion of all IT jobs advertised in Cumbria.

Work Breakdown Structure
Salary Trend in Cumbria
Salary distribution trend for jobs in Cumbria citing Work Breakdown Structure.

Work Breakdown Structure
Job Locations in Cumbria
The table below looks at the demand and provides a guide to the median salaries quoted in IT jobs citing Work Breakdown Structure within the Cumbria region over the 6 months to 19 September 2025. The 'Rank Change' column provides an indication of the change in demand within each location based on the same 6 month period last year.
Location | Rank Change on Same Period Last Year |
Matching Permanent IT Job Ads |
Median Salary Past 6 Months |
Median Salary % Change on Same Period Last Year |
Live Jobs |
---|---|---|---|---|---|
Kirkby-in-Furness | - | 1 | £51,636 | - | |
Work Breakdown Structure North West |
Work Breakdown Structure
Co-occurring Skills and Capabilities in Cumbria by Category
The follow tables expand on the table above by listing co-occurrences grouped by category. The same employment type, locality and period is covered with up to 20 co-occurrences shown in each of the following categories:
|
|
|||||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||
|