The table below provides summary statistics for permanent job vacancies advertised in Docklands, London requiring Risk Register skills. It includes a benchmarking guide to the annual salaries offered in vacancies that cited Risk Register over the 6 months leading up to 19 August 2025, comparing them to the same period in the previous two years.
6 months to 19 Aug 2025
Same period 2024
Same period 2023
Rank
10
-
-
Rank change year-on-year
-
-
-
Permanent jobs citing Risk Register
7
0
0
As % of all permanent jobs advertised in Docklands, London
Risk Register falls under the Processes and Methodologies category. For comparison with the information above, the following table provides summary statistics for all permanent job vacancies requiring process or methodology skills in Docklands, London.
Permanent vacancies with a requirement for process or methodology skills
40
18
54
As % of all permanent jobs advertised in Docklands, London
97.56%
100.00%
88.52%
Number of salaries quoted
40
18
54
10th Percentile
£80,000
£54,500
£34,754
25th Percentile
£83,000
£65,000
£55,000
Median annual salary (50th Percentile)
£100,000
£81,250
£80,000
Median % change year-on-year
+23.08%
+1.56%
+31.15%
75th Percentile
£107,500
£115,000
£107,500
90th Percentile
£109,500
£127,500
-
East London median annual salary
£78,750
£53,046
£52,500
% change year-on-year
+48.46%
+1.04%
-25.00%
Risk Register Job Vacancy Trend in Docklands, London
Job postings citing Risk Register as a proportion of all IT jobs advertised in Docklands, London.
Risk Register Salary Trend in Docklands, London
3-month moving average salary quoted in jobs citing Risk Register in Docklands, London.
Risk Register Salary Histogram in Docklands, London
Salary distribution for jobs citing Risk Register in Docklands, London over the 6 months to 19 August 2025.
Risk Register Top 26 Co-occurring Skills and Capabilities in Docklands, London
For the 6 months to 19 August 2025, job vacancies citing Risk Register also mentioned the following skills and capabilities in order of popularity.
The figures indicate the absolute number co-occurrences and as a proportion of all permanent job ads across the Docklands, London region with a requirement for Risk Register.
Risk Register Co-occurring Skills and Capabilities in Docklands, London by Category
The follow tables expand on the table above by listing co-occurrences grouped by category.
The same employment type, locality and period is covered with up to 20 co-occurrences shown in each of the following categories: