Work Breakdown Structure (WBS)
South East > Isle of Wight
The table below provides summary statistics for permanent job vacancies advertised in the Isle of Wight requiring Work Breakdown Structure skills. It includes a benchmarking guide to the annual salaries offered in vacancies that cited Work Breakdown Structure over the 6 months leading up to 4 May 2025, comparing them to the same period in the previous two years.
6 months to 4 May 2025 |
Same period 2024 | Same period 2023 | |
---|---|---|---|
Rank | 69 | - | - |
Rank change year-on-year | - | - | - |
Permanent jobs citing Work Breakdown Structure | 12 | 0 | 0 |
As % of all permanent jobs advertised in the Isle of Wight | 1.37% | - | - |
As % of the Processes & Methodologies category | 1.41% | - | - |
Number of salaries quoted | 11 | 0 | 0 |
Median annual salary (50th Percentile) | £65,000 | - | - |
South East median annual salary | £65,000 | £45,000 | £81,500 |
% change year-on-year | +44.44% | -44.79% | +3.49% |
All Process and Methodology Skills
Isle of Wight
Work Breakdown Structure falls under the Processes and Methodologies category. For comparison with the information above, the following table provides summary statistics for all permanent job vacancies requiring process or methodology skills in the Isle of Wight.
Permanent vacancies with a requirement for process or methodology skills | 852 | 10 | 13 |
As % of all permanent jobs advertised in the Isle of Wight | 97.59% | 83.33% | 100.00% |
Number of salaries quoted | 615 | 10 | 3 |
10th Percentile | £55,000 | - | £26,850 |
25th Percentile | £60,000 | £22,500 | £31,875 |
Median annual salary (50th Percentile) | £65,000 | £33,750 | £43,500 |
Median % change year-on-year | +92.59% | -22.41% | +12.99% |
75th Percentile | £70,600 | £43,750 | £46,750 |
90th Percentile | - | - | - |
South East median annual salary | £55,678 | £50,000 | £55,000 |
% change year-on-year | +11.36% | -9.09% | - |
Work Breakdown Structure
Job Vacancy Trend in the Isle of Wight
Job postings citing Work Breakdown Structure as a proportion of all IT jobs advertised in the Isle of Wight.

Work Breakdown Structure
Job Locations in the Isle of Wight
The table below looks at the demand and provides a guide to the median salaries quoted in IT jobs citing Work Breakdown Structure within the Isle of Wight region over the 6 months to 4 May 2025. The 'Rank Change' column provides an indication of the change in demand within each location based on the same 6 month period last year.
Location | Rank Change on Same Period Last Year |
Matching Permanent IT Job Ads |
Median Salary Past 6 Months |
Median Salary % Change on Same Period Last Year |
Live Jobs |
---|---|---|---|---|---|
Bembridge | - | 2 | £65,000 | - | |
Cowes | - | 2 | £65,000 | - | |
Freshwater | - | 2 | £65,000 | - | |
Ryde | - | 2 | £65,000 | - | |
Sandown | - | 2 | £65,000 | - | |
Work Breakdown Structure South East |
Work Breakdown Structure
Co-occurring Skills and Capabilities in the Isle of Wight by Category
The follow tables expand on the table above by listing co-occurrences grouped by category. The same employment type, locality and period is covered with up to 20 co-occurrences shown in each of the following categories:
|
|
||||||||||||||||||||||||||||||||||||||||||
|