Project Controller Job Trends in Warwickshire

Project Controller
West Midlands > Warwickshire

The median Project Controller salary in Warwickshire is £30,000 per year, according to job vacancies posted during the 6 months leading to 16 December 2025.

The table below compares current salary benchmarking and summary statistics with the previous two years.

6 months to
16 Dec 2025
Same period 2024 Same period 2023
Rank 53 - -
Rank change year-on-year - - -
Permanent jobs requiring a Project Controller 2 0 0
As % of all permanent jobs in Warwickshire 0.30% - -
As % of the Job Titles category 0.35% - -
Number of salaries quoted 2 0 0
Median annual salary (50th Percentile) £30,000 - -
West Midlands median annual salary £30,000 - -

All Permanent IT Job Vacancies
Warwickshire

For comparison with the information above, the following table provides summary statistics for all permanent IT job vacancies in Warwickshire. Most job vacancies include a discernible job title that can be normalized. As such, the figures in the second row provide an indication of the number of permanent jobs in our overall sample.

Permanent vacancies in Warwickshire with a recognized job title 574 660 463
% of permanent jobs with a recognized job title 86.06% 93.88% 93.16%
Number of salaries quoted 221 194 355
10th Percentile £27,000 £32,650 £28,500
25th Percentile £31,250 £42,500 £31,229
Median annual salary (50th Percentile) £50,000 £52,500 £50,000
Median % change year-on-year -4.76% +5.00% +6.38%
75th Percentile £67,500 £72,500 £60,000
90th Percentile £85,000 £79,625 £76,500
West Midlands median annual salary £50,000 £52,500 £50,000
% change year-on-year -4.76% +5.00% -3.91%

Project Controller
Job Vacancy Trend in Warwickshire

Historical trend showing the proportion of permanent IT job postings featuring 'Project Controller' in the job title relative to all permanent IT jobs advertised in Warwickshire.

Project Controller job vacancy trend in Warwickshire

Project Controller
Salary Trend in Warwickshire

Salary distribution trend for Project Controller job vacancies in Warwickshire.

Salary distribution trend for Project Controller job vacancies in Warwickshire

Project Controller
Job Locations in Warwickshire

The table below looks at the demand and provides a guide to the median salaries quoted in IT jobs citing Project Controller within the Warwickshire region over the 6 months to 16 December 2025. The 'Rank Change' column provides an indication of the change in demand within each location based on the same 6 month period last year.

Location Rank Change
on Same Period
Last Year
Matching
Permanent
IT Job Ads
Median Salary
Past 6 Months
Median Salary
% Change
on Same Period
Last Year
Live
Jobs
Kenilworth - 2 £30,000 -
Project Controller
West Midlands