The table below provides summary statistics for contract job vacancies advertised in Derby requiring Work Breakdown Structure skills. It includes a benchmarking guide to the contractor rates offered in vacancies that cited Work Breakdown Structure over the 6 months leading up to 21 August 2025, comparing them to the same period in the previous two years.
6 months to 21 Aug 2025
Same period 2024
Same period 2023
Rank
17
-
19
Rank change year-on-year
-
-
-
DemandTrendContract jobs citing Work Breakdown Structure
Work Breakdown Structure falls under the Processes and Methodologies category. For comparison with the information above, the following table provides summary statistics for all contract job vacancies requiring process or methodology skills in Derby.
DemandTrendContract vacancies with a requirement for process or methodology skills
66
95
78
As % of all contract IT jobs advertised in Derby
81.48%
71.43%
83.87%
Number of daily rates quoted
35
54
58
10th Percentile
£171
£250
£142
25th Percentile
£319
£322
£334
Median daily rate (50th Percentile)
£575
£500
£475
Median % change year-on-year
+15.00%
+5.26%
+18.75%
75th Percentile
£650
£588
£619
90th Percentile
£740
£623
£653
Derbyshire median daily rate
£585
£498
£475
% change year-on-year
+17.59%
+4.74%
+18.75%
Number of hourly rates quoted
10
3
4
10th Percentile
£24.83
-
£15.99
25th Percentile
£25.07
-
£17.10
Median hourly rate
£25.15
£17.00
£18.86
Median % change year-on-year
+47.94%
-9.86%
-4.09%
75th Percentile
-
£18.00
£31.25
90th Percentile
-
£18.60
£51.50
Derbyshire median hourly rate
£25.15
£25.77
£30.00
% change year-on-year
-2.39%
-14.12%
+52.56%
Work Breakdown Structure Job Vacancy Trend in Derby
Job postings citing Work Breakdown Structure as a proportion of all IT jobs advertised in Derby.
Work Breakdown Structure Daily Rate Trend in Derby
Contractor daily rate distribution trend for jobs in Derby citing Work Breakdown Structure.
Work Breakdown Structure Hourly Rate Trend in Derby
Contractor hourly rate distribution trend for jobs in Derby citing Work Breakdown Structure.
Work Breakdown Structure Top 8 Co-occurring Skills and Capabilities in Derby
For the 6 months to 21 August 2025, contractor job vacancies citing Work Breakdown Structure also mentioned the following skills and capabilities in order of popularity.
The figures indicate the absolute number co-occurrences and as a proportion of all contract job ads across the Derby region with a requirement for Work Breakdown Structure.
Work Breakdown Structure Co-occurring Skills and Capabilities in Derby by Category
The follow tables expand on the table above by listing co-occurrences grouped by category.
The same employment type, locality and period is covered with up to 20 co-occurrences shown in each of the following categories: