Work Breakdown Structure Contracts in Derbyshire

Work Breakdown Structure (WBS)
East Midlands > Derbyshire

The table below provides summary statistics for contract job vacancies advertised in Derbyshire requiring Work Breakdown Structure skills. It includes a benchmarking guide to the contractor rates offered in vacancies that cited Work Breakdown Structure over the 6 months leading up to 26 August 2025, comparing them to the same period in the previous two years.

6 months to
26 Aug 2025
Same period 2024 Same period 2023
Rank 20 - 21
Rank change year-on-year - - -
DemandTrendContract jobs citing Work Breakdown Structure 1 0 1
As % of all contract jobs advertised in Derbyshire 0.99% - 0.72%
As % of the Processes & Methodologies category 1.20% - 0.83%
Number of daily rates quoted 1 0 1
10th Percentile - - -
25th Percentile £213 - -
Median daily rate (50th Percentile) £225 - £878
75th Percentile £238 - -
90th Percentile - - -
East Midlands median daily rate £225 - £878

All Process and Methodology Skills
Derbyshire

Work Breakdown Structure falls under the Processes and Methodologies category. For comparison with the information above, the following table provides summary statistics for all contract job vacancies requiring process or methodology skills in Derbyshire.

DemandTrendContract vacancies with a requirement for process or methodology skills 83 117 121
As % of all contract IT jobs advertised in Derbyshire 82.18% 70.48% 87.05%
Number of daily rates quoted 47 63 82
10th Percentile £151 £253 £221
25th Percentile £294 £325 £363
Median daily rate (50th Percentile) £580 £495 £475
Median % change year-on-year +17.17% +4.21% +10.14%
75th Percentile £725 £588 £619
90th Percentile £810 £627 £650
East Midlands median daily rate £405 £450 £500
% change year-on-year -10.00% -10.00% +7.53%
Number of hourly rates quoted 12 13 11
10th Percentile £16.03 - £17.72
25th Percentile £24.53 £17.00 £21.50
Median hourly rate £25.15 £25.77 £30.00
Median % change year-on-year -2.39% -14.12% +52.56%
75th Percentile - £50.00 £53.88
90th Percentile - - £54.00
East Midlands median hourly rate £18.87 £19.16 £31.76
% change year-on-year -1.51% -39.67% +61.51%

Work Breakdown Structure
Job Vacancy Trend in Derbyshire

Job postings citing Work Breakdown Structure as a proportion of all IT jobs advertised in Derbyshire.

Job vacancy trend for Work Breakdown Structure in Derbyshire

Work Breakdown Structure
Daily Rate Trend in Derbyshire

Contractor daily rate distribution trend for jobs in Derbyshire citing Work Breakdown Structure.

Contractor daily rate distribution trend for jobs in Derbyshire citing Work Breakdown Structure

Work Breakdown Structure
Hourly Rate Trend in Derbyshire

Contractor hourly rate distribution trend for jobs in Derbyshire citing Work Breakdown Structure.

Contractor hourly rate distribution trend for jobs in Derbyshire citing Work Breakdown Structure

Work Breakdown Structure
DemandTrendContract Job Locations in Derbyshire

The table below looks at the demand and provides a guide to the median contractor rates quoted in IT jobs citing Work Breakdown Structure within the Derbyshire region over the 6 months to 26 August 2025. The 'Rank Change' column provides an indication of the change in demand within each location based on the same 6 month period last year.

Location Rank Change
on Same Period
Last Year
Matching
DemandTrendContract
IT Job Ads
Median
Daily Rate
Past 6 Months
Median Daily Rate
% Change
on Same Period
Last Year
Live
Jobs
Derby - 1 £225 - 1
Work Breakdown Structure
East Midlands

Work Breakdown Structure
Co-occurring Skills and Capabilities in Derbyshire by Category

The follow tables expand on the table above by listing co-occurrences grouped by category. The same employment type, locality and period is covered with up to 20 co-occurrences shown in each of the following categories:

General
1 1 (100.00%) Documentation Skills
1 1 (100.00%) Social Skills
Job Titles
1 1 (100.00%) Configuration Engineer
1 1 (100.00%) Deployment Engineer
1 1 (100.00%) SC Cleared Deployment Engineer
1 1 (100.00%) Site Engineer
Miscellaneous
1 1 (100.00%) Legacy Systems
1 1 (100.00%) Onboarding
Operating Systems
1 1 (100.00%) Windows
Processes & Methodologies
1 1 (100.00%) Resource Allocation
Qualifications
1 1 (100.00%) SC Cleared
1 1 (100.00%) Security Cleared