The median Senior Project Controller daily rate in Hampshire is £500, according to job vacancies posted in the 6 months leading up to 1 May 2025.
The table below provides contractor rate benchmarking and summary statistics, comparing them to the same period in the previous two years.
6 months to 1 May 2025 |
Same period 2024 | Same period 2023 | |
---|---|---|---|
Rank | 68 | - | - |
Rank change year-on-year | - | - | - |
Contract jobs requiring a Senior Project Controller | 1 | 0 | 0 |
As % of all contract jobs advertised in Hampshire | 0.13% | - | - |
As % of the Job Titles category | 0.14% | - | - |
Number of daily rates quoted | 1 | 0 | 0 |
Median daily rate (50th Percentile) | £500 | - | - |
South East median daily rate | £500 | - | - |
All Contract IT Job Vacancies
Hampshire
For comparison with the information above, the following table provides summary statistics for all contract IT job vacancies in Hampshire. Most job vacancies include a discernible job title that can be normalized. As such, the figures in the second row provide an indication of the number of contract jobs in our overall sample.
Contract vacancies in Hampshire with a recognized job title | 712 | 1,451 | 1,323 |
% of contract IT jobs with a recognized job title | 95.44% | 90.12% | 94.16% |
Number of daily rates quoted | 519 | 824 | 865 |
10th Percentile | £280 | £363 | £232 |
25th Percentile | £425 | £450 | £413 |
Median daily rate (50th Percentile) | £538 | £575 | £525 |
Median % change year-on-year | -6.52% | +9.52% | +5.00% |
75th Percentile | £613 | £675 | £620 |
90th Percentile | £661 | £738 | £700 |
South East median daily rate | £500 | £500 | £500 |
% change year-on-year | - | - | +2.42% |
Number of hourly rates quoted | 45 | 173 | 106 |
10th Percentile | £20.03 | £13.40 | £18.25 |
25th Percentile | £24.66 | £33.75 | £22.51 |
Median hourly rate | £55.00 | £57.35 | £52.50 |
Median % change year-on-year | -4.10% | +9.24% | +141.38% |
75th Percentile | £71.25 | £62.50 | £67.50 |
90th Percentile | £75.00 | £76.86 | £75.00 |
South East median hourly rate | £32.50 | £47.50 | £48.40 |
% change year-on-year | -31.58% | -1.86% | +130.48% |
Senior Project Controller
Job Vacancy Trend in Hampshire
Job postings that featured Senior Project Controller in the job title as a proportion of all IT jobs advertised in Hampshire.

Senior Project Controller
Contract Job Locations in Hampshire
The table below looks at the demand and provides a guide to the median contractor rates quoted in IT jobs citing Senior Project Controller within the Hampshire region over the 6 months to 1 May 2025. The 'Rank Change' column provides an indication of the change in demand within each location based on the same 6 month period last year.
Location | Rank Change on Same Period Last Year |
Matching Contract IT Job Ads |
Median Daily Rate Past 6 Months |
Median Daily Rate % Change on Same Period Last Year |
Live Jobs |
---|---|---|---|---|---|
Farnborough | - | 1 | £500 | - | |
Senior Project Controller South East |
Senior Project Controller Skill Set
Top 16 Co-occurring Skills and Capabilities in Hampshire
For the 6 months to 1 May 2025, Senior Project Controller contract job roles required the following skills and capabilities in order of popularity. The figures indicate the absolute number co-occurrences and as a proportion of all contract job ads across the Hampshire region featuring Senior Project Controller in the job title.
|
|
Senior Project Controller Skill Set
Co-occurring Skills and Capabilities in Hampshire by Category
The follow tables expand on the table above by listing co-occurrences grouped by category. The same employment type, locality and period is covered with up to 20 co-occurrences shown in each of the following categories:
|
|
||||||||||||||||||||||||||||||||||||||||||
|
|