The median Project Planner daily rate in Oxfordshire is £46, according to job vacancies posted in the 6 months leading up to 1 October 2026.
The table below compares current contractor rates and summary statistics with the previous two years.
|
|
6 months to 1 Oct 2026 |
Same period 2025 | Same period 2024 |
|---|---|---|---|
| Rank | 56 | - | - |
| Rank change year-on-year | - | - | - |
| Contract jobs requiring a Project Planner | 1 | 0 | 0 |
| As % of all contract jobs in Oxfordshire | 0.22% | - | - |
| As % of the Job Titles category | 0.27% | - | - |
| Number of daily rates quoted | 1 | 0 | 0 |
| Median daily rate (50th Percentile) | £46 | - | - |
| South East median daily rate | £525 | £500 | £450 |
| % change year-on-year | +5.00% | +11.11% | +60.71% |
All Contract IT Job Roles
Oxfordshire
For comparison with the information above, the following table provides summary statistics for all contract IT job vacancies in Oxfordshire. Most job vacancies include a discernible job title that can be normalized. As such, the figures in the second row provide an indication of the number of contract jobs in our overall sample.
| Contract vacancies in Oxfordshire with a recognized job title | 375 | 130 | 143 |
| % of contract IT jobs with a recognized job title | 83.33% | 89.66% | 91.08% |
| Number of daily rates quoted | 169 | 79 | 84 |
| 10th Percentile | £225 | £170 | £163 |
| 25th Percentile | £370 | £222 | £325 |
| Median daily rate (50th Percentile) | £500 | £413 | £450 |
| Median % change year-on-year | +21.21% | -8.33% | - |
| 75th Percentile | £588 | £550 | £503 |
| 90th Percentile | £738 | £635 | £638 |
| South East median daily rate | £525 | £500 | £505 |
| % change year-on-year | +5.00% | -0.99% | +1.00% |
| Number of hourly rates quoted | 65 | 12 | 13 |
| 10th Percentile | £13.57 | - | - |
| 25th Percentile | £18.25 | £25.15 | £12.18 |
| Median hourly rate | £37.00 | £25.83 | £20.50 |
| Median % change year-on-year | +43.27% | +25.98% | -36.53% |
| 75th Percentile | £53.75 | £84.66 | £25.99 |
| 90th Percentile | £63.75 | £89.63 | £59.50 |
| South East median hourly rate | £48.81 | £25.15 | £58.49 |
| % change year-on-year | +94.08% | -57.00% | +12.70% |
Project Planner
Job Vacancy Trend in Oxfordshire
Historical trend showing the proportion of contract IT job postings featuring 'Project Planner' in the job title relative to all contract IT jobs advertised in Oxfordshire.
Project Planner
Daily Rate Trend in Oxfordshire
Contractor daily rate distribution trend for Project Planner job vacancies in Oxfordshire.
Project Planner
Hourly Rate Trend in Oxfordshire
Contractor hourly rate distribution trend for Project Planner job vacancies in Oxfordshire.
Project Planner
Contract Job Locations in Oxfordshire
The table below looks at the demand and provides a guide to the median contractor rates quoted in IT jobs citing Project Planner within the Oxfordshire region over the 6 months to 1 October 2026. The 'Rank Change' column provides an indication of the change in demand within each location based on the same 6 month period last year.
| Location | Rank Change on Same Period Last Year |
Matching Contract IT Job Ads |
Median Daily Rate Past 6 Months |
Median Daily Rate % Change on Same Period Last Year |
Live Jobs |
|---|---|---|---|---|---|
| Oxford | - | 1 | £46 | - | |
| Project Planner South East |
|||||
Project Planner Skill Set
Top 18 Co-Occurring Skills & Capabilities in Oxfordshire
For the 6 months to 1 October 2026, Project Planner contract job roles required the following skills and capabilities in order of popularity. The figures indicate the absolute number of co-occurrences and as a proportion of all contract job ads across the Oxfordshire region featuring Project Planner in the job title.
|
|
Project Planner Skill Set
Co-Occurring Skills & Capabilities in Oxfordshire by Category
The following tables expand on the one above by listing co-occurrences grouped by category. They cover the same employment type, locality and period, with up to 20 co-occurrences shown in each category:
|
|
||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||