The table below provides summary statistics and contractor rates for jobs advertised in Reading requiring Work Breakdown Structure skills. It covers vacancies from the 6 months leading up to 29 August 2025, with comparisons to the same periods in the previous two years.
Work Breakdown Structure falls under the Processes and Methodologies category. For comparison with the information above, the following table provides summary statistics for all contract job vacancies requiring process or methodology skills in Reading.
Contract vacancies with a requirement for process or methodology skills
543
944
997
As % of all contract IT jobs advertised in Reading
91.88%
85.90%
88.62%
Number of daily rates quoted
346
515
660
10th Percentile
£355
£350
£317
25th Percentile
£450
£474
£425
Median daily rate (50th Percentile)
£550
£585
£550
Median % change year-on-year
-5.98%
+6.36%
+10.00%
75th Percentile
£625
£650
£638
90th Percentile
£700
£715
£700
Berkshire median daily rate
£514
£550
£525
% change year-on-year
-6.59%
+4.76%
+5.00%
Number of hourly rates quoted
18
31
21
10th Percentile
-
£14.50
£18.50
25th Percentile
£14.75
£54.58
£53.50
Median hourly rate
£20.38
£61.60
£65.13
Median % change year-on-year
-66.92%
-5.41%
+168.56%
75th Percentile
£38.42
£75.93
£74.00
90th Percentile
£59.13
£87.46
£75.25
Berkshire median hourly rate
£32.05
£61.60
£60.00
% change year-on-year
-47.97%
+2.67%
+147.42%
Work Breakdown Structure Job Vacancy Trend in Reading
Job postings citing Work Breakdown Structure as a proportion of all IT jobs advertised in Reading.
Work Breakdown Structure Daily Rate Trend in Reading
Contractor daily rate distribution trend for jobs in Reading citing Work Breakdown Structure.
Work Breakdown Structure Hourly Rate Trend in Reading
Contractor hourly rate distribution trend for jobs in Reading citing Work Breakdown Structure.
Work Breakdown Structure Top 11 Co-occurring Skills and Capabilities in Reading
For the 6 months to 29 August 2025, contractor job vacancies citing Work Breakdown Structure also mentioned the following skills and capabilities in order of popularity.
The figures indicate the absolute number co-occurrences and as a proportion of all contract job ads across the Reading region with a requirement for Work Breakdown Structure.
Work Breakdown Structure Co-occurring Skills and Capabilities in Reading by Category
The follow tables expand on the table above by listing co-occurrences grouped by category.
The same employment type, locality and period is covered with up to 20 co-occurrences shown in each of the following categories: