The median Project Controller daily rate in Sheffield is £345, according to job vacancies posted in the 6 months leading up to 22 August 2025.
The table below provides contractor rate benchmarking and summary statistics, comparing them to the same period in the previous two years.
6 months to 22 Aug 2025 |
Same period 2024 | Same period 2023 | |
---|---|---|---|
Rank | 69 | - | - |
Rank change year-on-year | - | - | - |
DemandTrendContract jobs requiring a Project Controller | 2 | 0 | 0 |
As % of all contract jobs advertised in Sheffield | 0.35% | - | - |
As % of the Job Titles category | 0.38% | - | - |
Number of daily rates quoted | 1 | 0 | 0 |
Median daily rate (50th Percentile) | £345 | - | - |
South Yorkshire median daily rate | £345 | - | - |
All DemandTrendContract IT Job Vacancies
Sheffield
For comparison with the information above, the following table provides summary statistics for all contract IT job vacancies in Sheffield. Most job vacancies include a discernible job title that can be normalized. As such, the figures in the second row provide an indication of the number of contract jobs in our overall sample.
DemandTrendContract vacancies in Sheffield with a recognized job title | 526 | 366 | 350 |
% of contract IT jobs with a recognized job title | 90.85% | 88.19% | 94.59% |
Number of daily rates quoted | 355 | 211 | 230 |
10th Percentile | £298 | £386 | £374 |
25th Percentile | £375 | £436 | £473 |
Median daily rate (50th Percentile) | £469 | £525 | £600 |
Median % change year-on-year | -10.67% | -12.50% | +14.29% |
75th Percentile | £538 | £588 | £688 |
90th Percentile | £613 | £625 | £745 |
South Yorkshire median daily rate | £466 | £514 | £550 |
% change year-on-year | -9.44% | -6.55% | +10.00% |
Number of hourly rates quoted | 4 | 6 | 6 |
10th Percentile | - | £15.88 | £11.64 |
25th Percentile | £18.10 | £20.13 | £13.77 |
Median hourly rate | £18.35 | £21.00 | £19.50 |
Median % change year-on-year | -12.61% | +7.69% | +2.63% |
75th Percentile | £18.50 | £21.88 | £22.06 |
90th Percentile | £18.51 | £22.00 | £27.00 |
South Yorkshire median hourly rate | £18.35 | £21.00 | £20.00 |
% change year-on-year | -12.61% | +5.00% | +5.26% |
Project Controller
Job Vacancy Trend in Sheffield
Job postings that featured Project Controller in the job title as a proportion of all IT jobs advertised in Sheffield.

Project Controller Skill Set
Top 4 Co-occurring Skills and Capabilities in Sheffield
For the 6 months to 22 August 2025, Project Controller contract job roles required the following skills and capabilities in order of popularity. The figures indicate the absolute number co-occurrences and as a proportion of all contract job ads across the Sheffield region featuring Project Controller in the job title.
|
Project Controller Skill Set
Co-occurring Skills and Capabilities in Sheffield by Category
The follow tables expand on the table above by listing co-occurrences grouped by category. The same employment type, locality and period is covered with up to 20 co-occurrences shown in each of the following categories:
|
|