Project Controller
Yorkshire > South Yorkshire
The median Project Controller daily rate in South Yorkshire is £345, according to job vacancies posted in the 6 months leading up to 20 August 2025.
The table below provides contractor rate benchmarking and summary statistics, comparing them to the same period in the previous two years.
6 months to 20 Aug 2025 |
Same period 2024 | Same period 2023 | |
---|---|---|---|
Rank | 73 | - | - |
Rank change year-on-year | - | - | - |
DemandTrendContract jobs requiring a Project Controller | 2 | 0 | 0 |
As % of all contract jobs advertised in South Yorkshire | 0.31% | - | - |
As % of the Job Titles category | 0.34% | - | - |
Number of daily rates quoted | 1 | 0 | 0 |
Median daily rate (50th Percentile) | £345 | - | - |
Yorkshire median daily rate | £345 | - | - |
All DemandTrendContract IT Job Vacancies
South Yorkshire
For comparison with the information above, the following table provides summary statistics for all contract IT job vacancies in South Yorkshire. Most job vacancies include a discernible job title that can be normalized. As such, the figures in the second row provide an indication of the number of contract jobs in our overall sample.
DemandTrendContract vacancies in South Yorkshire with a recognized job title | 580 | 403 | 407 |
% of contract IT jobs with a recognized job title | 90.91% | 87.04% | 94.87% |
Number of daily rates quoted | 393 | 246 | 278 |
10th Percentile | £291 | £238 | £279 |
25th Percentile | £369 | £425 | £450 |
Median daily rate (50th Percentile) | £466 | £514 | £550 |
Median % change year-on-year | -9.34% | -6.55% | +10.00% |
75th Percentile | £538 | £581 | £675 |
90th Percentile | £612 | £625 | £744 |
Yorkshire median daily rate | £475 | £500 | £525 |
% change year-on-year | -5.00% | -4.76% | +5.00% |
Number of hourly rates quoted | 4 | 6 | 6 |
10th Percentile | - | £15.88 | £11.64 |
25th Percentile | £18.10 | £20.13 | £13.77 |
Median hourly rate | £18.35 | £21.00 | £19.50 |
Median % change year-on-year | -12.61% | +7.69% | +2.63% |
75th Percentile | £18.50 | £21.88 | £22.06 |
90th Percentile | £18.51 | £22.00 | £36.38 |
Yorkshire median hourly rate | £22.14 | £20.87 | £20.00 |
% change year-on-year | +6.09% | +4.35% | +5.26% |
Project Controller
Job Vacancy Trend in South Yorkshire
Job postings that featured Project Controller in the job title as a proportion of all IT jobs advertised in South Yorkshire.

Project Controller
DemandTrendContract Job Locations in South Yorkshire
The table below looks at the demand and provides a guide to the median contractor rates quoted in IT jobs citing Project Controller within the South Yorkshire region over the 6 months to 20 August 2025. The 'Rank Change' column provides an indication of the change in demand within each location based on the same 6 month period last year.
Location | Rank Change on Same Period Last Year |
Matching DemandTrendContract IT Job Ads |
Median Daily Rate Past 6 Months |
Median Daily Rate % Change on Same Period Last Year |
Live Jobs |
---|---|---|---|---|---|
Sheffield | - | 2 | £345 | - | |
Project Controller Yorkshire |
Project Controller Skill Set
Top 4 Co-occurring Skills and Capabilities in South Yorkshire
For the 6 months to 20 August 2025, Project Controller contract job roles required the following skills and capabilities in order of popularity. The figures indicate the absolute number co-occurrences and as a proportion of all contract job ads across the South Yorkshire region featuring Project Controller in the job title.
|
Project Controller Skill Set
Co-occurring Skills and Capabilities in South Yorkshire by Category
The follow tables expand on the table above by listing co-occurrences grouped by category. The same employment type, locality and period is covered with up to 20 co-occurrences shown in each of the following categories:
|
|