Project Planning Jobs in Bedfordshire

Project Planning
East of England > Bedfordshire

The table below provides summary statistics for permanent job vacancies advertised in Bedfordshire requiring Project Planning skills. It includes a benchmarking guide to the annual salaries offered in vacancies that cited Project Planning over the 6 months leading up to 17 May 2025, comparing them to the same period in the previous two years.

6 months to
17 May 2025
Same period 2024 Same period 2023
Rank 56 - -
Rank change year-on-year - - -
Permanent jobs citing Project Planning 3 0 0
As % of all permanent jobs advertised in Bedfordshire 0.52% - -
As % of the Processes & Methodologies category 0.55% - -
Number of salaries quoted 0 0 0
Median annual salary (50th Percentile) - - -
East of England median annual salary £55,000 £40,000 £66,250
% change year-on-year +37.50% -39.62% +32.50%

All Process and Methodology Skills
Bedfordshire

Project Planning falls under the Processes and Methodologies category. For comparison with the information above, the following table provides summary statistics for all permanent job vacancies requiring process or methodology skills in Bedfordshire.

Permanent vacancies with a requirement for process or methodology skills 549 343 644
As % of all permanent jobs advertised in Bedfordshire 95.15% 76.91% 98.17%
Number of salaries quoted 109 241 293
10th Percentile £31,250 £26,000 £35,764
25th Percentile £38,000 £32,500 £45,000
Median annual salary (50th Percentile) £50,967 £50,000 £57,500
Median % change year-on-year +1.93% -13.04% +15.00%
75th Percentile £66,000 £67,500 £67,500
90th Percentile £72,750 £92,500 £85,000
East of England median annual salary £50,967 £50,000 £55,000
% change year-on-year +1.93% -9.09% +10.00%

Project Planning
Job Vacancy Trend in Bedfordshire

Job postings citing Project Planning as a proportion of all IT jobs advertised in Bedfordshire.

Job vacancy trend for Project Planning in Bedfordshire

Project Planning
Salary Trend in Bedfordshire

3-month moving average salary quoted in jobs citing Project Planning in Bedfordshire.

Salary trend for Project Planning in Bedfordshire

Project Planning
Co-occurring Skills and Capabilities in Bedfordshire by Category

The follow tables expand on the table above by listing co-occurrences grouped by category. The same employment type, locality and period is covered with up to 20 co-occurrences shown in each of the following categories:

General
1 3 (100.00%) Electronics
1 3 (100.00%) Inclusion and Diversity
1 3 (100.00%) Manufacturing
Job Titles
1 3 (100.00%) Associate Engineer
1 3 (100.00%) Design Engineer
1 3 (100.00%) Electronics Design Engineer
1 3 (100.00%) Electronics Engineer
1 3 (100.00%) PCB Design Engineer
1 3 (100.00%) PCB Engineer
Processes & Methodologies
1 3 (100.00%) Schematic Capture
Qualifications
1 3 (100.00%) Degree
1 3 (100.00%) HND
Vendors
1 3 (100.00%) EMC