Project Planner Jobs in East London

Project Planner
London > East London

The median Project Planner salary in East London is £77,500 per year, according to job vacancies posted during the 6 months leading to 17 August 2025.

The table below provides salary benchmarking and summary statistics, comparing them to the same period in the previous two years.

6 months to
17 Aug 2025
Same period 2024 Same period 2023
Rank 43 - -
Rank change year-on-year - - -
Permanent jobs requiring a Project Planner 1 0 0
As % of all permanent jobs advertised in East London 0.41% - -
As % of the Job Titles category 0.47% - -
Number of salaries quoted 1 0 0
10th Percentile - - -
25th Percentile £76,250 - -
Median annual salary (50th Percentile) £77,500 - -
75th Percentile £78,750 - -
90th Percentile - - -
London median annual salary £77,500 - £24,000

All Permanent IT Job Vacancies
East London

For comparison with the information above, the following table provides summary statistics for all permanent IT job vacancies in East London. Most job vacancies include a discernible job title that can be normalized. As such, the figures in the second row provide an indication of the number of permanent jobs in our overall sample.

Permanent vacancies in East London with a recognized job title 212 117 296
% of permanent jobs with a recognized job title 86.53% 80.69% 92.79%
Number of salaries quoted 83 73 253
10th Percentile £32,000 £25,600 £26,250
25th Percentile £48,750 £36,250 £34,000
Median annual salary (50th Percentile) £80,000 £47,500 £50,000
Median % change year-on-year +68.42% -5.00% -25.93%
75th Percentile £100,000 £72,500 £65,000
90th Percentile £107,500 £115,000 £107,000
London median annual salary £72,500 £71,000 £73,000
% change year-on-year +2.11% -2.74% +4.29%

Project Planner
Job Vacancy Trend in East London

Job postings that featured Project Planner in the job title as a proportion of all IT jobs advertised in East London.

Job vacancy trend for Project Planner in East London

Project Planner
Salary Trend in East London

3-month moving average salary quoted in jobs citing Project Planner in East London.

Salary trend for Project Planner in East London

Project Planner
Job Locations in East London

The table below looks at the demand and provides a guide to the median salaries quoted in IT jobs citing Project Planner within the East London region over the 6 months to 17 August 2025. The 'Rank Change' column provides an indication of the change in demand within each location based on the same 6 month period last year.

Location Rank Change
on Same Period
Last Year
Matching
Permanent
IT Job Ads
Median Salary
Past 6 Months
Median Salary
% Change
on Same Period
Last Year
Live
Jobs
Docklands, London - 1 £77,500 -
Project Planner
London

Project Planner Skill Set
Top 13 Co-occurring Skills and Capabilities in East London

For the 6 months to 17 August 2025, Project Planner job roles required the following skills and capabilities in order of popularity. The figures indicate the absolute number co-occurrences and as a proportion of all permanent job ads across the East London region featuring Project Planner in the job title.

1 1 (100.00%) Microsoft Project
1 1 (100.00%) Microsoft Office
1 1 (100.00%) SharePoint
1 1 (100.00%) Microsoft
1 1 (100.00%) Project Management
1 1 (100.00%) Change Management
1 1 (100.00%) Finance
1 1 (100.00%) Agile
1 1 (100.00%) Waterfall
1 1 (100.00%) Project Governance
1 1 (100.00%) PMO
1 1 (100.00%) Social Skills
1 1 (100.00%) Documentation Skills

Project Planner Skill Set
Co-occurring Skills and Capabilities in East London by Category

The follow tables expand on the table above by listing co-occurrences grouped by category. The same employment type, locality and period is covered with up to 20 co-occurrences shown in each of the following categories:

Application Platforms
1 1 (100.00%) SharePoint
Applications
1 1 (100.00%) Microsoft Office
1 1 (100.00%) Microsoft Project
General
1 1 (100.00%) Documentation Skills
1 1 (100.00%) Finance
1 1 (100.00%) Social Skills
Processes & Methodologies
1 1 (100.00%) Agile
1 1 (100.00%) Change Management
1 1 (100.00%) Project Governance
1 1 (100.00%) Project Management
1 1 (100.00%) Waterfall
Quality Assurance & Compliance
1 1 (100.00%) PMO
Vendors
1 1 (100.00%) Microsoft