Project Controller Jobs in London

Project Controller
England > London

The median Project Controller salary in London is £52,000 per year, according to job vacancies posted during the 6 months leading to 10 May 2025.

The table below provides salary benchmarking and summary statistics, comparing them to the same period in the previous two years.

6 months to
10 May 2025
Same period 2024 Same period 2023
Rank 400 504 610
Rank change year-on-year +104 +106 +272
Permanent jobs requiring a Project Controller 1 4 3
As % of all permanent jobs advertised in London 0.008% 0.017% 0.009%
As % of the Job Titles category 0.009% 0.018% 0.009%
Number of salaries quoted 1 4 1
10th Percentile - - -
25th Percentile £46,000 £45,364 £31,250
Median annual salary (50th Percentile) £52,000 £49,874 £32,500
Median % change year-on-year +4.26% +53.46% -23.08%
75th Percentile £58,000 £54,383 £33,750
90th Percentile - - -
England median annual salary £53,500 £42,300 £40,000
% change year-on-year +26.48% +5.75% -6.98%

All Permanent IT Job Vacancies
London

For comparison with the information above, the following table provides summary statistics for all permanent IT job vacancies in London. Most job vacancies include a discernible job title that can be normalized. As such, the figures in the second row provide an indication of the number of permanent jobs in our overall sample.

Permanent vacancies in London with a recognized job title 11,599 22,211 32,675
% of permanent jobs with a recognized job title 90.15% 94.13% 95.00%
Number of salaries quoted 7,448 16,662 24,070
10th Percentile £41,250 £38,000 £42,500
25th Percentile £55,000 £51,250 £55,000
Median annual salary (50th Percentile) £75,000 £70,000 £72,500
Median % change year-on-year +7.14% -3.45% +3.57%
75th Percentile £100,000 £93,750 £95,000
90th Percentile £122,500 £115,000 £115,000
England median annual salary £57,500 £53,500 £60,800
% change year-on-year +7.48% -12.01% +1.33%

Project Controller
Job Vacancy Trend in London

Job postings that featured Project Controller in the job title as a proportion of all IT jobs advertised in London.

Job vacancy trend for Project Controller in London

Project Controller
Salary Trend in London

3-month moving average salary quoted in jobs citing Project Controller in London.

Salary trend for Project Controller in London

Project Controller
Job Locations in London

The table below looks at the demand and provides a guide to the median salaries quoted in IT jobs citing Project Controller within the London region over the 6 months to 10 May 2025. The 'Rank Change' column provides an indication of the change in demand within each location based on the same 6 month period last year.

Location Rank Change
on Same Period
Last Year
Matching
Permanent
IT Job Ads
Median Salary
Past 6 Months
Median Salary
% Change
on Same Period
Last Year
Live
Jobs
North London - 1 £52,000 -
Project Controller
England

Project Controller Skill Set
Top 6 Co-occurring Skills and Capabilities in London

For the 6 months to 10 May 2025, Project Controller job roles required the following skills and capabilities in order of popularity. The figures indicate the absolute number co-occurrences and as a proportion of all permanent job ads across the London region featuring Project Controller in the job title.

1 1 (100.00%) Primavera
1 1 (100.00%) Risk Analysis
1 1 (100.00%) Analytical Skills
1 1 (100.00%) Decision-Making
1 1 (100.00%) Problem-Solving
1 1 (100.00%) Social Skills

Project Controller Skill Set
Co-occurring Skills and Capabilities in London by Category

The follow tables expand on the table above by listing co-occurrences grouped by category. The same employment type, locality and period is covered with up to 20 co-occurrences shown in each of the following categories:

Business Applications
1 1 (100.00%) Primavera
General
1 1 (100.00%) Analytical Skills
1 1 (100.00%) Social Skills
Processes & Methodologies
1 1 (100.00%) Decision-Making
1 1 (100.00%) Problem-Solving
1 1 (100.00%) Risk Analysis