Work Breakdown Structure (WBS)
South East > Hampshire
The table below provides summary statistics and salary benchmarking for jobs advertised in Hampshire requiring Work Breakdown Structure skills. It covers permanent job vacancies from the 6 months leading up to 13 June 2026, with comparisons to the same periods in the previous two years.
|
|
6 months to 13 Jun 2026 |
Same period 2025 | Same period 2024 |
|---|---|---|---|
| Rank | 137 | 113 | - |
| Rank change year-on-year | -24 | - | - |
| Permanent jobs citing Work Breakdown Structure | 2 | 1 | 0 |
| As % of all permanent jobs in Hampshire | 0.053% | 0.063% | - |
| As % of the Processes & Methodologies category | 0.075% | 0.072% | - |
| Number of salaries quoted | 1 | 0 | 0 |
| Median annual salary (50th Percentile) | £65,000 | - | - |
| South East median annual salary | £65,000 | - | £45,000 |
| % change year-on-year | - | - | -44.79% |
All Process & Methodology Skills
Hampshire
Work Breakdown Structure falls under the Processes and Methodologies category. For comparison with the information above, the following table provides summary statistics for all permanent job vacancies requiring process or methodology skills in Hampshire.
| Permanent vacancies with a requirement for process or methodology skills | 2,658 | 1,393 | 3,642 |
| As % of all permanent jobs advertised in Hampshire | 71.07% | 87.83% | 79.29% |
| Number of salaries quoted | 1,928 | 828 | 2,767 |
| 10th Percentile | £29,500 | £27,000 | £28,500 |
| 25th Percentile | £35,000 | £35,000 | £40,000 |
| Median annual salary (50th Percentile) | £52,500 | £52,500 | £50,000 |
| Median % change year-on-year | - | +5.00% | -9.09% |
| 75th Percentile | £72,500 | £67,500 | £65,000 |
| 90th Percentile | £85,000 | £78,750 | £77,500 |
| South East median annual salary | £55,000 | £52,500 | £50,000 |
| % change year-on-year | +4.76% | +5.00% | -9.09% |
Work Breakdown Structure
Job Vacancy Trend in Hampshire
Historical trend showing the proportion of permanent IT job postings citing Work Breakdown Structure relative to all permanent IT jobs advertised in Hampshire.
Work Breakdown Structure
Salary Trend in Hampshire
Salary distribution trend for jobs in Hampshire citing Work Breakdown Structure.
Work Breakdown Structure
Job Locations in Hampshire
The table below looks at the demand and provides a guide to the median salaries quoted in IT jobs citing Work Breakdown Structure within the Hampshire region over the 6 months to 13 June 2026. The 'Rank Change' column provides an indication of the change in demand within each location based on the same 6 month period last year.
| Location | Rank Change on Same Period Last Year |
Matching Permanent IT Job Ads |
Median Salary Past 6 Months |
Median Salary % Change on Same Period Last Year |
Live Jobs |
|---|---|---|---|---|---|
| Portsmouth | -3 | 1 | £65,000 | - | |
| Southampton | - | 1 | - | - | |
| Southsea | - | 1 | £65,000 | - | |
| Work Breakdown Structure South East |
|||||
Work Breakdown Structure
Co-Occurring Skills & Capabilities in Hampshire by Category
The following tables expand on the one above by listing co-occurrences grouped by category. They cover the same employment type, locality and period, with up to 20 co-occurrences shown in each category:
|
|
|||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||