Resource Levelling
England > London
The table below provides summary statistics and salary benchmarking for jobs advertised in London requiring Resource Levelling skills. It covers permanent job vacancies from the 6 months leading up to 17 July 2026, with comparisons to the same periods in the previous two years.
|
|
6 months to 17 Jul 2026 |
Same period 2025 | Same period 2024 |
|---|---|---|---|
| Rank | 418 | - | - |
| Rank change year-on-year | - | - | - |
| Permanent jobs citing Resource Levelling | 1 | 0 | 0 |
| As % of all permanent jobs in London | 0.004% | - | - |
| As % of the Processes & Methodologies category | 0.005% | - | - |
| Number of salaries quoted | 1 | 0 | 0 |
| 10th Percentile | - | - | - |
| 25th Percentile | £147,500 | - | - |
| Median annual salary (50th Percentile) | £155,000 | - | - |
| 75th Percentile | £162,500 | - | - |
| 90th Percentile | - | - | - |
| England median annual salary | £155,000 | - | £32,000 |
All Process & Methodology Skills
London
Resource Levelling falls under the Processes and Methodologies category. For comparison with the information above, the following table provides summary statistics for all permanent job vacancies requiring process or methodology skills in London.
| Permanent vacancies with a requirement for process or methodology skills | 18,337 | 11,781 | 20,187 |
| As % of all permanent jobs advertised in London | 82.28% | 94.66% | 89.58% |
| Number of salaries quoted | 12,558 | 7,403 | 14,459 |
| 10th Percentile | £40,500 | £40,542 | £38,500 |
| 25th Percentile | £55,000 | £55,000 | £51,250 |
| Median annual salary (50th Percentile) | £75,000 | £75,000 | £72,500 |
| Median % change year-on-year | - | +3.45% | -3.33% |
| 75th Percentile | £97,500 | £100,000 | £95,000 |
| 90th Percentile | £108,000 | £122,500 | £118,750 |
| England median annual salary | £60,000 | £57,500 | £55,000 |
| % change year-on-year | +4.35% | +4.55% | -12.00% |
Resource Levelling
Job Vacancy Trend in London
Historical trend showing the proportion of permanent IT job postings citing Resource Levelling relative to all permanent IT jobs advertised in London.
Resource Levelling
Salary Trend in London
Salary distribution trend for jobs in London citing Resource Levelling.
Resource Levelling
Job Locations in London
The table below looks at the demand and provides a guide to the median salaries quoted in IT jobs citing Resource Levelling within the London region over the 6 months to 17 July 2026. The 'Rank Change' column provides an indication of the change in demand within each location based on the same 6 month period last year.
| Location | Rank Change on Same Period Last Year |
Matching Permanent IT Job Ads |
Median Salary Past 6 Months |
Median Salary % Change on Same Period Last Year |
Live Jobs |
|---|---|---|---|---|---|
| Central London | - | 1 | £155,000 | - | |
| Resource Levelling England |
|||||
Resource Levelling
Co-Occurring Skills & Capabilities in London by Category
The following tables expand on the one above by listing co-occurrences grouped by category. They cover the same employment type, locality and period, with up to 20 co-occurrences shown in each category:
|
|
||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||