The median Project Control Manager salary in England is £60,000 per year, according to job vacancies posted during the 6 months leading to 24 May 2026.

The table below compares current salary benchmarking and summary statistics with the previous two years.

6 months to
24 May 2026
Same period 2025 Same period 2024
Rank 695 - 818
Rank change year-on-year - - -
Permanent jobs requiring a Project Control Manager 9 0 3
As % of all permanent jobs in England 0.011% - 0.004%
As % of the Job Titles category 0.012% - 0.004%
Number of salaries quoted 9 0 2
10th Percentile - - £40,900
25th Percentile - - £42,625
Median annual salary (50th Percentile) £60,000 - £47,000
75th Percentile - - £51,125
90th Percentile - - £52,700
UK median annual salary £60,000 - £47,000

All Permanent IT Job Roles
England

For comparison with the information above, the following table provides summary statistics for all permanent IT job vacancies in England. Most job vacancies include a discernible job title that can be normalized. As such, the figures in the second row provide an indication of the number of permanent jobs in our overall sample.

Permanent vacancies in England with a recognized job title 77,318 34,317 80,969
% of permanent jobs with a recognized job title 93.37% 89.54% 94.58%
Number of salaries quoted 52,516 19,695 61,369
10th Percentile £30,000 £30,000 £28,500
25th Percentile £40,000 £41,250 £38,125
Median annual salary (50th Percentile) £55,250 £57,500 £53,000
Median % change year-on-year -3.91% +8.49% -12.83%
75th Percentile £75,000 £77,750 £71,250
90th Percentile £96,250 £100,000 £90,000
UK median annual salary £55,000 £57,500 £52,500
% change year-on-year -4.35% +9.52% -12.50%

Project Control Manager
Job Vacancy Trend in England

Historical trend showing the proportion of permanent IT job postings featuring 'Project Control Manager' in the job title relative to all permanent IT jobs advertised in England.

Project Control Manager job vacancy trend in England

Project Control Manager
Salary Trend in England

Salary distribution trend for Project Control Manager job vacancies in England.

Salary distribution trend for Project Control Manager job vacancies in England

Project Control Manager
Job Locations in England

The table below looks at the demand and provides a guide to the median salaries quoted in IT jobs citing Project Control Manager within the England region over the 6 months to 24 May 2026. The 'Rank Change' column provides an indication of the change in demand within each location based on the same 6 month period last year.

Location Rank Change
on Same Period
Last Year
Matching
Permanent
IT Job Ads
Median Salary
Past 6 Months
Median Salary
% Change
on Same Period
Last Year
Live
Jobs
London - 9 £60,000 -
Project Control Manager